Life Member Philadelphia International Airport Tour
Presented by Lawrence R. Ebling, PE, Senior Construction Manager, Burns Engineering, Inc.
The tour will focus on the Central Utility Building and the Main Terminal Electric Substation and Generators Building for the Philadelphia International Airport, Attendees will be able to observe and hear descriptions and capabilities of the equipment (chillers, boilers, pumps, controllers, switchgear, transformers, generators etc.) that provide conditioned water and electrical power that are distributed throughout the airport for heating and cooling.
ON LINE RESERVATION BEFORE JANUARY 21, 2020 IS REQUIRED
Date and Time
Location
Hosts
Registration
- Date: 23 Jan 2020
- Time: 06:30 PM to 08:00 PM
- All times are (GMT-05:00) US/Eastern
- Add Event to Calendar
- Contact Event Host
- Co-sponsored by Pennsylvania Society of Professional Engineers
Agenda
Registration: 6:30 PM to 6:45 PM
Assembly and Briefing: 6:45 PM to 6:55 PM
Tour 7:00 PM to 8:00 PM
ATTENDEE NAME AND LAST 4 DIGITS OF SSN ARE REQUIRED
PHOTO ID MUST BE PRESENTED AT REGISTRATION