BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
DTSTART:20180311T030000
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:CDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20171105T010000
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:CST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20180503T000000Z
UID:E2AC1810-EDD8-4AFC-ACA1-CBB7E894CD07
DTSTART;TZID=America/Chicago:20180111T173000
DTEND;TZID=America/Chicago:20180111T203000
DESCRIPTION:The Rowe Energy Control Center (RECC) houses Minnesota Power’
 s Real-time Balancing Authority Area\, Transmission &amp; Distribution operati
 ng functions and is staffed by NERC-certified operators 24/7\, 365 days a 
 year. The RECC is the primary Control Center for operation of the MP Bulk 
 Electric System (BES) and houses many critical systems and functions withi
 n the facility. The RECC was constructed to survive severe weather threats
 \, minimize exposure to electronic interference\, and operate independentl
 y during blackout conditions.\n\nCo-sponsored by: Wayne Shields\, Bruce Ho
 well\n\nBldg: Minnesota Power Operations Center\, 3215 W Arrowhead Rd\, Du
 luth\, Minnesota\, United States\, 55811
LOCATION:Bldg: Minnesota Power Operations Center\, 3215 W Arrowhead Rd\, Du
 luth\, Minnesota\, United States\, 55811
ORGANIZER:wshields@mnpower.com
SEQUENCE:0
SUMMARY:MN Power Operations Center Tour Followed by Dinner at Crooked Pint 
 Ale House
URL;VALUE=URI:https://events.vtools.ieee.org/m/158029
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;The Rowe Energy Control Center (RECC) hous
 es Minnesota Power&amp;rsquo\;s Real-time Balancing Authority Area\, Transmiss
 ion &amp;amp\; Distribution operating functions and is staffed by NERC-certifi
 ed operators 24/7\, 365 days a year. The RECC is the primary Control Cente
 r for operation of the MP Bulk Electric System (BES) and houses many criti
 cal systems and functions within the facility. The RECC was constructed to
  survive severe weather threats\, minimize exposure to electronic interfer
 ence\, and operate independently during blackout conditions.&lt;/p&gt;
END:VEVENT
END:VCALENDAR

