BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:US/Pacific
BEGIN:DAYLIGHT
DTSTART:20180311T030000
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:PDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20181104T010000
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:PST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20180503T000000Z
UID:D4DC944F-8609-4CF7-8FBF-E62C18D00B96
DTSTART;TZID=US/Pacific:20180314T114500
DTEND;TZID=US/Pacific:20180314T130000
DESCRIPTION:Title: Pacific Gas &amp; Electric’s New Pole Loading Database\n\n
 Presenter: John (JB) Birch - Manager - PG&amp;E’s Electric Asset Management\
 , Engineering Center of Excellence.\n\nABSTRACT :\n\nOn December 28\, 2017
 \, PG&amp;E integrated a new database called the Pole Loading Database (PLDB) 
 into their enterprise platforms of GIS and SAP. The database and its innov
 ative structure is intended to replace the need to save individual “flat
 ” files as Pole Loading Calculations – instead\, any analysis of a pol
 e and its facilities can be saved as a new version of the PLDB record – 
 maintaining an asset-centric history of each pole going forward. The datab
 ase was also pre-loaded with values based on existing SAP and GIS records 
 for each pole (height\, class\, span lengths\, wood strength\, etc.) – w
 e call these records “Baseline” calculations. Any pole in our system c
 an now be hovered over in our GIS Web Viewer to reveal its safety factor o
 r clicked to jump into any saved version of a 3-D model for that structure
 . The latest activities and information can also be viewed through our new
  SAP dashboard\, dubbed “ZPOLE.”\n\nLunch will be provided (includes v
 egetarian). There will be a $5 fee to IEEE Members and a $10 fee to Non Me
 mbers. Payments to be made in person (cash or check) at the event.\n\nThe 
 SF PES Chapter AdCom is mindful of our environment and food waste. As a co
 urtesy\, please email our Secretary\, Rahul Anilkumar (ranilkumar@quanta-t
 echnology.com) no later than the day before the event if you absolutely ne
 ed to cancel your reservation. Thank you!\n\nSpeaker(s): John (JB) Birch -
  Manager - PG&amp;E’s Electric Asset Management\, Engineering Center of Exce
 llence\, \n\nRoom: Benicia Room\, Bldg: Hiram W. Johnson State Office Buil
 ding (Cross streets: Polk and Larkin)\, 455 Golden Gate Avenue\, Milton Ma
 rks Conference Center - Lower Level\, San Francisco\, California\, United 
 States\, 94102
LOCATION:Room: Benicia Room\, Bldg: Hiram W. Johnson State Office Building 
 (Cross streets: Polk and Larkin)\, 455 Golden Gate Avenue\, Milton Marks C
 onference Center - Lower Level\, San Francisco\, California\, United State
 s\, 94102
ORGANIZER:ranilkumar@quanta-technology.com
SEQUENCE:11
SUMMARY:SF Power and Energy Society Technical Presentation March 14\, 2018
URL;VALUE=URI:https://events.vtools.ieee.org/m/169496
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;&lt;span style=&quot;font-size: 12pt\;&quot;&gt;&lt;strong&gt;&lt;e
 m&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; 
 &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; Title: Pacific Gas
  &amp;amp\; Electric&amp;rsquo\;s New Pole Loading Database&lt;/span&gt;&lt;/em&gt;&lt;/strong&gt;&lt;/
 span&gt;&lt;/p&gt;\n&lt;p&gt;&lt;span style=&quot;font-size: 12pt\;&quot;&gt;&lt;strong&gt;Presenter: John (JB)
  Birch - Manager - PG&amp;amp\;E&amp;rsquo\;s Electric Asset Management\, Engineer
 ing Center of Excellence.&lt;/strong&gt;&lt;/span&gt;&lt;/p&gt;\n&lt;p class=&quot;yiv0956969325MsoN
 ormal&quot;&gt;&lt;span style=&quot;color: #ff6600\; font-size: 12pt\;&quot;&gt;&lt;span style=&quot;color
 : #000000\;&quot;&gt;ABSTRACT :&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;On December 28\, 2017\, PG&amp;a
 mp\;E integrated a new database called the Pole Loading Database (PLDB) in
 to their enterprise platforms of GIS and SAP. The database and its innovat
 ive structure is intended to replace the need to save individual &amp;ldquo\;f
 lat&amp;rdquo\; files as Pole Loading Calculations &amp;ndash\; instead\, any anal
 ysis of a pole and its facilities can be saved as a new version of the PLD
 B record &amp;ndash\; maintaining an asset-centric history of each pole going 
 forward. The database was also pre-loaded with values based on existing SA
 P and GIS records for each pole (height\, class\, span lengths\, wood stre
 ngth\, etc.) &amp;ndash\; we call these records &amp;ldquo\;Baseline&amp;rdquo\; calcu
 lations. Any pole in our system can now be hovered over in our GIS Web Vie
 wer to reveal its safety factor or clicked to jump into any saved version 
 of a 3-D model for that structure. The latest activities and information c
 an also be viewed through our new SAP dashboard\, dubbed &amp;ldquo\;ZPOLE.&amp;rd
 quo\;&lt;/p&gt;\n&lt;p class=&quot;yiv0956969325MsoNormal&quot;&gt;&lt;span style=&quot;color: #ff6600\;
  font-size: 12pt\;&quot;&gt;Lunch will be provided (includes vegetarian). There wi
 ll be a $5 fee to IEEE Members and a $10 fee to Non Members. Payments to b
 e made in person (cash or check) at the event.&lt;/span&gt;&lt;/p&gt;\n&lt;p class=&quot;yiv09
 56969325MsoNormal&quot;&gt;&lt;span style=&quot;color: #ff6600\;&quot;&gt;&lt;span style=&quot;color: #008
 000\;&quot;&gt;The SF PES Chapter AdCom is mindful of our environment and food was
 te. &amp;nbsp\;As a courtesy\, please email our Secretary\, Rahul Anilkumar (r
 anilkumar@quanta-technology.com) no later than the day before the event if
  you absolutely need to cancel your reservation. &amp;nbsp\;Thank you!&amp;nbsp\;&lt;
 /span&gt;&amp;nbsp\;&lt;/span&gt;&lt;/p&gt;
END:VEVENT
END:VCALENDAR

