BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:Canada/Mountain
BEGIN:DAYLIGHT
DTSTART:20180311T030000
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:MDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20181104T010000
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:MST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20190123T225141Z
UID:3CC50423-F5DB-4285-BE3F-E916AD27F20F
DTSTART;TZID=Canada/Mountain:20180425T120000
DTEND;TZID=Canada/Mountain:20180426T130000
DESCRIPTION:Great news\, we&#39;re collaborating with ISA to host VIP tours spe
 cifically for our chapter during the ISA Automation and Conference Expo in
  Edmonton. You may chose one of the three streams that interest you. Pleas
 e indicate your first and second choice on the registration. 1) Automation
  and Control Systems 2) Instrumentation 3) Electrical Applications.\n\nAn 
 hour long VIP Tour allows us to interact with select exhibitors and highli
 ghts innovative products and/or services. Expect pre-planned exhibitor pre
 sentations specific to your VIP Tour group\, improved information flow\, k
 nowledge gain\, and your time to be maximized. More information at: https:
 //aecalberta.ca/latest-news/posts/ieee-vip-tours/\n\nIEEE Member End-User 
 VIP - Automation &amp; Control Systems\n\nDate: Wednesday\, April 25\nTime: 12
 pm - 1pm\nHear From:\n\n- Rockwell Automation\n- Cybertech\n- Direct Contr
 ols\n- Microwatt Controls\n- Guillevin Automation\n- GS Hitech Controls\n\
 nIEEE Member End-User VIP - Instrumentation\n\nDate: Wednesday\, April 25\
 nTime: 3pm - 4pm\nHear From:\n\n- Chubb Edwards Signaling Devices\n- FLIR 
 Systems\n- Greyline Instruments\n- Honeywell - BMS\n- Endress + Hauser\n- 
 Detcon Site Sentinel Smart Wireless Detector\n\nIEEE Member End-User VIP -
  Electrical Applications\n\nDate: Thursday\, April 26\nTime: 12pm - 1pm\nH
 ear From:\n\n- CB Engineering - AC Dandy\n- Tundra Process Solutions\n- GE
  - VFD&#39;s &amp; MCC Packages\n- Magna IV\n- Phoenix Contact Canada\n- Spartech 
 Manufacturing\n\nEven though there is no registration fee\, this is a clos
 ed event for IEEE members only and please note that registration is limite
 d to a first come\, first served basis. Because of concerns on group sizes
 \, each stream will be restricted to a size of 10 only. If for any reason 
 you cannot go\, please provide notice by April 13 so that your spot can be
  opened up to someone who is waiting.\n\nCo-sponsored by: ISA AEC (Heidi D
 ennis)\n\nBldg: Edmonton Expo Centre\, 7515 118 Ave NW\, Edmonton\, Albert
 a\, Canada\, T5B 0J2
LOCATION:Bldg: Edmonton Expo Centre\, 7515 118 Ave NW\, Edmonton\, Alberta\
 , Canada\, T5B 0J2
ORGANIZER:carllam@ieee.org
SEQUENCE:7
SUMMARY:IEEE and ISA joint event: VIP Tours
URL;VALUE=URI:https://events.vtools.ieee.org/m/170545
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;Great news\, we&#39;re collaborating with ISA 
 to host VIP tours specifically for our chapter during the ISA Automation a
 nd Conference Expo in Edmonton. &lt;strong&gt;You may chose one of the three str
 eams that interest you&lt;/strong&gt;. &lt;strong&gt;Please indicate your first and se
 cond choice on the registration.&lt;/strong&gt; 1) Automation and Control System
 s 2) Instrumentation 3) Electrical Applications.&lt;/p&gt;\n&lt;p&gt;An hour long&amp;nbsp
 \;VIP Tour allows us to interact with select exhibitors&amp;nbsp\;and highligh
 ts innovative products and/or services. Expect pre-planned exhibitor prese
 ntations specific to your VIP Tour group\, improved information flow\, kno
 wledge gain\, and your time to be maximized. More information at: https://
 aecalberta.ca/latest-news/posts/ieee-vip-tours/&lt;/p&gt;\n&lt;p&gt;&lt;span class=&quot;orang
 e-font&quot;&gt;IEEE Member End-User VIP - &lt;strong&gt;Automation &amp;amp\; Control Syste
 ms&lt;/strong&gt;&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;Date: Wednesday\, April 25&lt;br /&gt;Time: 12pm - 1p
 m&lt;br /&gt;Hear From:&lt;/p&gt;\n&lt;ul&gt;\n&lt;li&gt;Rockwell Automation&lt;/li&gt;\n&lt;li&gt;Cybertech&lt;/
 li&gt;\n&lt;li&gt;Direct Controls&lt;/li&gt;\n&lt;li&gt;Microwatt Controls&lt;/li&gt;\n&lt;li&gt;Guillevin 
 Automation&lt;/li&gt;\n&lt;li&gt;GS Hitech Controls&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p&gt;&lt;span class=&quot;orang
 e-font&quot;&gt;&lt;br /&gt;IEEE Member End-User VIP - &lt;strong&gt;Instrumentation&lt;/strong&gt;&lt;
 /span&gt;&lt;/p&gt;\n&lt;p&gt;Date: Wednesday\, April 25&lt;br /&gt;Time: 3pm - 4pm&lt;br /&gt;Hear F
 rom:&lt;/p&gt;\n&lt;ul&gt;\n&lt;li&gt;Chubb Edwards Signaling Devices&lt;/li&gt;\n&lt;li&gt;FLIR Systems
 &lt;/li&gt;\n&lt;li&gt;Greyline Instruments&lt;/li&gt;\n&lt;li&gt;Honeywell - BMS&lt;/li&gt;\n&lt;li&gt;Endres
 s + Hauser&lt;/li&gt;\n&lt;li&gt;Detcon Site Sentinel Smart Wireless Detector&lt;/li&gt;\n&lt;/
 ul&gt;\n&lt;p&gt;&lt;span class=&quot;orange-font&quot;&gt;&lt;br /&gt;IEEE Member End-User VIP - &lt;strong
 &gt;Electrical Applications&lt;/strong&gt;&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;Date: Thursday\, April 26
 &lt;br /&gt;Time: 12pm - 1pm&lt;br /&gt;Hear From:&lt;/p&gt;\n&lt;ul&gt;\n&lt;li&gt;CB Engineering - AC 
 Dandy&lt;/li&gt;\n&lt;li&gt;Tundra Process Solutions&lt;/li&gt;\n&lt;li&gt;GE - VFD&#39;s &amp;amp\; MCC P
 ackages&lt;/li&gt;\n&lt;li&gt;Magna IV&lt;/li&gt;\n&lt;li&gt;Phoenix Contact Canada&lt;/li&gt;\n&lt;li&gt;Spar
 tech Manufacturing&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p&gt;Even though there is no registration fe
 e\, this is a closed&amp;nbsp\;event for IEEE members only and please note tha
 t registration is limited to a first come\, first served basis. Because of
  concerns on group sizes\, each stream will be restricted to a size of 10 
 only. If for any reason you cannot go\, please provide notice by April 13 
 so that your spot can be opened up to someone who is waiting.&lt;/p&gt;
END:VEVENT
END:VCALENDAR

