BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:US/Pacific
BEGIN:DAYLIGHT
DTSTART:20190310T030000
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:PDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20191103T010000
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:PST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20191001T164505Z
UID:95B6C7E4-947E-4E0D-A4D4-D34FA8DC8890
DTSTART;TZID=US/Pacific:20190924T173000
DTEND;TZID=US/Pacific:20190924T203000
DESCRIPTION:Summary: NFPA-99 made changes designating all Operating Rooms a
 s Wet Procedure Locations\, unless a documented risk assessment proves oth
 erwise. While this does not change the requirements for Isolated Power Sys
 tems (IPS) per NFPA-70 Article 517\, the utilization of IPS is increasing.
  This session will discuss the NEC and NFPA-99 code changes as related to 
 isolated power systems. Furthermore\, the session will discuss best practi
 ces in the design\, installation\, maintenance &amp; usage of the systems.\n\n
 Learning Objectives 1: Identification of the NFPA-99&#39;s new risk based desi
 gn approach and associated (Chapter 4) categories\n\nLearning Objectives 2
 : Understand the applicable codes &amp; standards including NFPA-99 Code chang
 es as it relates to Operating Rooms and spaces deemed as &quot;Wet Procedure Lo
 cations&quot;\n\nLearning Objectives 3: Understand the theory of operation of I
 solated Power Systems and Line Isolation Monitors (LIMs)\n\nLearning Objec
 tives 4: Understand best practices for the equipment selection\, installat
 ion\, and maintenance of Isolated Power Systems and Line Isolation Monitor
 s (LIMs)\n\nSpeaker(s): David Knecht\, \n\nAgenda: \nFuture Meetings:\n\nO
 ctober 22\, 2019 Topic: Load Bank Applications Review ( ASCO presenting)\n
 \nNovember 12\, 2019 Battery Storage Systems (Tesla presenting)\n\nFriday 
 February 28\, 2020 Annual Engineering Seminar ( Topics and presenters TBA)
 \n\nSan Francisco Italian Athletic Club\, 1630 Stockton St\, San Francisco
 \, CA 94133\, San Francisco\, California\, United States\, 94133
LOCATION:San Francisco Italian Athletic Club\, 1630 Stockton St\, San Franc
 isco\, CA 94133\, San Francisco\, California\, United States\, 94133
ORGANIZER:finn.schenck@iemfg.com
SEQUENCE:9
SUMMARY:Best Design Practices for Isolated Power Systems in Healthcare Faci
 lities
URL;VALUE=URI:https://events.vtools.ieee.org/m/201499
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;&amp;nbsp\;&lt;/p&gt;\n&lt;table width=&quot;0&quot;&gt;\n&lt;tbody&gt;\n&lt;
 tr&gt;\n&lt;td width=&quot;1260&quot;&gt;\n&lt;p&gt;&lt;strong&gt;Summary:&lt;/strong&gt; NFPA-99 made changes 
 designating all Operating Rooms as Wet Procedure Locations\, unless a docu
 mented risk assessment proves otherwise. While this does not change the re
 quirements for Isolated Power Systems (IPS) per NFPA-70 Article 517\, the 
 utilization of IPS is increasing.&amp;nbsp\; This session will discuss the NEC
  and NFPA-99 code changes as related to isolated power systems. Furthermor
 e\, the session will discuss best practices in the design\, installation\,
  maintenance &amp;amp\; usage of the systems.&lt;/p&gt;\n&lt;/td&gt;\n&lt;/tr&gt;\n&lt;tr&gt;\n&lt;td wid
 th=&quot;1260&quot;&gt;\n&lt;p&gt;&lt;strong&gt;Learning Objectives 1&lt;/strong&gt;: Identification of t
 he NFPA-99&#39;s new risk based design approach and associated (Chapter 4) cat
 egories&lt;/p&gt;\n&lt;/td&gt;\n&lt;/tr&gt;\n&lt;tr&gt;\n&lt;td width=&quot;1260&quot;&gt;\n&lt;p&gt;&lt;strong&gt;Learning Ob
 jectives 2&lt;/strong&gt;: Understand the applicable codes &amp;amp\; standards incl
 uding NFPA-99 Code changes as it relates to Operating Rooms and spaces dee
 med as &quot;Wet Procedure Locations&quot;&lt;/p&gt;\n&lt;/td&gt;\n&lt;/tr&gt;\n&lt;tr&gt;\n&lt;td width=&quot;1260&quot;
 &gt;\n&lt;p&gt;&lt;strong&gt;Learning Objectives 3&lt;/strong&gt;: Understand the theory of ope
 ration of Isolated Power Systems and Line Isolation Monitors (LIMs)&lt;/p&gt;\n&lt;
 /td&gt;\n&lt;/tr&gt;\n&lt;tr&gt;\n&lt;td width=&quot;1260&quot;&gt;\n&lt;p&gt;&lt;strong&gt;Learning Objectives 4&lt;/st
 rong&gt;: Understand best practices for the equipment selection\, installatio
 n\, and maintenance of Isolated Power Systems and Line Isolation Monitors 
 (LIMs)&lt;/p&gt;\n&lt;/td&gt;\n&lt;/tr&gt;\n&lt;/tbody&gt;\n&lt;/table&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /&gt;&lt;p&gt;F
 uture Meetings:&lt;/p&gt;\n&lt;p&gt;October 22\, 2019&amp;nbsp\; Topic:&amp;nbsp\; Load Bank A
 pplications Review ( ASCO presenting)&lt;/p&gt;\n&lt;p&gt;November 12\, 2019 Battery S
 torage Systems (Tesla presenting)&lt;/p&gt;\n&lt;p&gt;Friday February 28\, 2020&amp;nbsp\;
  Annual Engineering Seminar&amp;nbsp\; ( Topics and presenters TBA)&lt;/p&gt;
END:VEVENT
END:VCALENDAR

