BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:US/Alaska
BEGIN:DAYLIGHT
DTSTART:20190310T030000
TZOFFSETFROM:-0900
TZOFFSETTO:-0800
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:AKDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20191103T010000
TZOFFSETFROM:-0800
TZOFFSETTO:-0900
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:AKST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20200113T195412Z
UID:CBDF070A-05CF-4010-9D30-854E5BFA6424
DTSTART;TZID=US/Alaska:20190904T080000
DTEND;TZID=US/Alaska:20190905T170000
DESCRIPTION:We have an opportunity to have a Workshop in Anchorage at the b
 eginning of September because engineers who have been engaged in the busin
 ess of Renewable Energy and in the development of the applicable standards
  will be in Alaska. The full agenda is still in development and any sugges
 tions for topics will be welcome to ensure this Workshop is of maximum ben
 efit to you and to Alaska. More announcements will be made as the developm
 ent of the Workshop unfolds. This information is applicable to anyone who 
 is considering Alternate Energy Applications for a Utility\, an Industrial
  facility\, a community power system or remote locations.\n\nIEEE 1547 has
  changed a lot since it was originally published in 2003. The high penetra
 tion of Solar energy DER in California and Hawaii demanded change in how i
 nterconnects need to interact with the EPS&#39;s so IEEE 1547 was revised to a
 ccommodate the new requirements. The IEEE 1547 changes force changes to th
 e UL 1741 Standard for grid tie inverters which will impact all those invo
 lved with interconnect of DER to EPS.\n\nI believe that now is a very good
  time to bring a lot of the technical issues out which can impact the Util
 ities planning\, and the IPP (Independent Power Producers) and any others 
 who need to know what the technical requirements and constraints are which
  affect how each proposed DER installation should be addressed. We are dea
 ling with systems\, both electrical power systems and communications syste
 ms.\n\nPotential topics\n\n- Islanding-Intentional and Unintentional\n- Vo
 ltage Ride through\n- Voltage and power control (active and reactive)\n- D
 ER (Inverter) performance requirements\n- Things engineers and managers fo
 r the EPS need to know.\n- Things IPP operators need to know.\n- Use of st
 ored energy\n- Open discussion or panel discussion on selected topics.\n\n
 Co-sponsored by: CH06268 - Alaska Section Chapter\, PE31\n\nSpeaker(s): Ma
 rk Siira\, Charlie Vartanian\n\nAgenda: \n8:00 am to 8:30 am Check in\, Ha
 nd out materials 8:30 am to 11:30 am Training (breaks will be scheduled du
 ring the Workshop 11:30 am to 12:15 pm Lunch 12:15 pm to 5:00 pm Training 
 (with breaks scheduled\n\nBldg: Alaska Communications Business Center\, 60
 0 East 36th Avenue\, Suite 100\, Anchorage\, Alaska\, United States\, 9950
 3
LOCATION:Bldg: Alaska Communications Business Center\, 600 East 36th Avenue
 \, Suite 100\, Anchorage\, Alaska\, United States\, 99503
ORGANIZER:seitzak@ieee.org
SEQUENCE:14
SUMMARY:IEEE 1547-2018 ALASKA WORKSHOP
URL;VALUE=URI:https://events.vtools.ieee.org/m/202370
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;We have an opportunity to have a Workshop 
 in Anchorage at the beginning of September because engineers who have been
  engaged in the business of Renewable Energy and in the development of the
  applicable standards will be in Alaska.&amp;nbsp\; The full agenda is still i
 n development and any suggestions for topics&amp;nbsp\;will be welcome&amp;nbsp\;t
 o ensure this Workshop is of maximum benefit to you and to Alaska.&amp;nbsp\; 
 More announcements will be made as the development of the Workshop unfolds
 .&amp;nbsp\; This information is applicable to anyone who is considering Alter
 nate Energy Applications for a Utility\, an Industrial facility\, a commun
 ity power system or&amp;nbsp\;remote locations.&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;IEEE 1547 has c
 hanged a lot since it was originally published in 2003.&amp;nbsp\; The high pe
 netration of Solar energy DER in California and Hawaii demanded change in 
 how interconnects need to interact with the EPS&#39;s so IEEE 1547 was revised
  to accommodate the new requirements.&amp;nbsp\; The IEEE 1547 changes force c
 hanges to the UL 1741 Standard for grid tie inverters which will impact al
 l those involved with interconnect of DER to EPS.&lt;/p&gt;\n&lt;p&gt;I believe that n
 ow is a very good time to bring a lot of the technical issues out which ca
 n impact the Utilities planning\, and the IPP (Independent Power Producers
 ) and any others who need to know what the technical requirements and cons
 traints are which affect how each proposed DER installation should be addr
 essed.&amp;nbsp\; We are dealing with systems\, both electrical power systems 
 and communications systems.&lt;/p&gt;\n&lt;p&gt;&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;Potential topics&lt;/p&gt;\n
 &lt;ul&gt;\n&lt;li&gt;Islanding-Intentional and Unintentional&lt;/li&gt;\n&lt;li&gt;Voltage Ride t
 hrough&lt;/li&gt;\n&lt;li&gt;Voltage and power control (active and reactive)&lt;/li&gt;\n&lt;li
 &gt;DER (Inverter) performance requirements&lt;/li&gt;\n&lt;li&gt;Things engineers and ma
 nagers for the&amp;nbsp\; EPS need to know.&lt;/li&gt;\n&lt;li&gt;Things IPP operators nee
 d to know.&lt;/li&gt;\n&lt;li&gt;Use of stored energy&lt;/li&gt;\n&lt;li&gt;Open discussion or pan
 el discussion on selected topics.&lt;/li&gt;\n&lt;/ul&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /&gt;&lt;p&gt;
 8:00 am to 8:30 am Check in\, Hand out materials 8:30 am to 11:30 am Train
 ing (breaks will be scheduled during the&amp;nbsp\;Workshop 11:30 am to 12:15 
 pm Lunch 12:15 pm to 5:00 pm Training (with breaks scheduled&lt;/p&gt;\n&lt;p&gt;&amp;nbsp
 \;&lt;/p&gt;
END:VEVENT
END:VCALENDAR

