BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:US/Mountain
BEGIN:DAYLIGHT
DTSTART:20200308T030000
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:MDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20201101T010000
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:MST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20200801T005538Z
UID:9B52B6F8-05CB-4986-B48B-6A29D051156F
DTSTART;TZID=US/Mountain:20200730T170000
DTEND;TZID=US/Mountain:20200730T183000
DESCRIPTION:The meeting consists of two parts: An update on the status of t
 he IEEE Pikes Peak Section and a Presentation on the Ames Hydro Power Plan
 t.\n\nThe agenda and the password-protected zoom link are shown here on th
 is announcement. Once you register for the meeting\, a password will be se
 nt to you by email before the meeting starts scheduled for 30 Jul 2020\, 5
 00 pm - 6:30 pm (MST)\n\nhttps://us02web.zoom.us/j/84442493454\nMeeting ID
 : 844 4249 3454 (you need to register for the meeting so you can receive a
  password sent to you by email before the start of the meeting)\nSummary o
 f Presentation\n\nThe Ames Hydro Power Plant: The First HV AC Transmission
  Anywhere\n\nSpeaker: Al Schaffer\, Retired PE\, Pikes Peak Section Life M
 ember\n\nIn 1888-90\, the battle for the dominant form of electrical power
  was underway between Thomas Edison/GE and Nicolas Tesla/Westinghouse in N
 ew York. In Colorado\, the Gold King Mine was going bankrupt powering its 
 Gold Mill with steam fueled by wood hauled by donkeys. Lucian Nunn\, Tellu
 ride banker &amp; investor in the Gold King Mine &amp; brother\, Paul Nunn\, an en
 gineer convinced Westinghouse to become the first Hydro power plant using 
 AC generator\, AC transmission line\, and AC generators to operate the Gol
 d King Mine operations. This presentation tells the story this first desig
 n\, how equipment was delivered to Mine by the Rio Grande Southern Railroa
 d\, how the facility was built and 3KV transmission was run for 2.6 miles 
 to the Gold Mill. After several iterations\, the current Ames Power Plant 
 has been operational since 1905 generating 3.6 MW of power.\n\nSpeaker Bio
 :\n\nAl Schaffer holds a BS Physics\, MSEE\, and MS CS. He worked for Batt
 elle Memorial Institute\, Collins Radio\, NCR\, Digital Equipment Corporat
 ion\, and HP/Agilient. He is a retired Professional Engineer (Ohio &amp; Color
 ado).\n\nSpeaker(s): John Santiago\, Al Schaffer\n\nAgenda: \nWELCOME AND 
 COMMENTS (15-20 minutes)\n\nVision and Mission Statements\n\nSurvey Result
 s of Technical Interests\n\nStrategic Goals\n\nFeedback and Comments\n\nPR
 ESENTATION ON AMES POWER PLANT (1 hour)\n\nZoom Meeting ID: 844 4249 3454\
 , Colorado Springs\, Colorado\, United States
LOCATION:Zoom Meeting ID: 844 4249 3454\, Colorado Springs\, Colorado\, Uni
 ted States
ORGANIZER:john.santiago@ieee.org
SEQUENCE:19
SUMMARY:Pikes Peak IEEE Section\, Virtual Meeting: Section Status Update &amp; 
 Ames Power Station Presentation
URL;VALUE=URI:https://events.vtools.ieee.org/m/235870
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;The meeting consists of two parts:&amp;nbsp\; 
 An update on the status of the IEEE Pikes Peak Section and a Presentation 
 on the Ames Hydro Power Plant.&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;The agenda and the password-
 protected zoom link are shown here on this announcement.&amp;nbsp\; &amp;nbsp\;Onc
 e you register for the meeting\, a password will be sent to you by email b
 efore the meeting starts scheduled for 30 Jul 2020\, 500 pm - 6:30 pm (MST
 )&lt;/p&gt;\n&lt;p&gt;&lt;a href=&quot;https://us02web.zoom.us/j/84442493454&quot;&gt;https://us02web.
 zoom.us/j/84442493454&lt;/a&gt;&lt;/p&gt;\n&lt;pre&gt;Meeting ID: 844 4249 3454 (you need to
  register for the meeting so you can receive a password sent to you by ema
 il before the start of the meeting)&lt;/pre&gt;\n&lt;p&gt;&lt;strong&gt;Summary of Presentat
 ion&lt;/strong&gt;&lt;/p&gt;\n&lt;p&gt;The Ames Hydro Power Plant: The First HV AC Transmiss
 ion Anywhere&lt;/p&gt;\n&lt;p&gt;Speaker: Al Schaffer\, Retired PE\, Pikes Peak Sectio
 n Life Member&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;In 1888-90\, the battle for the dominant form
  of electrical power was underway between Thomas Edison/GE and Nicolas Tes
 la/Westinghouse in New York.&amp;nbsp\; In Colorado\, the Gold King Mine was g
 oing bankrupt powering its Gold Mill with steam fueled by wood hauled by d
 onkeys. Lucian Nunn\, Telluride banker &amp;amp\; investor in the Gold King Mi
 ne &amp;amp\; brother\, Paul Nunn\, an engineer convinced Westinghouse to beco
 me the first Hydro power plant using AC generator\, AC transmission line\,
  and AC generators to operate the Gold King Mine operations.&amp;nbsp\; This p
 resentation tells the story this first design\, how equipment was delivere
 d to Mine by the Rio Grande Southern Railroad\, how the facility was built
  and 3KV transmission was run for 2.6 miles to the Gold Mill.&amp;nbsp\; After
  several iterations\, the current Ames Power Plant has been operational si
 nce 1905 generating 3.6 MW of power.&lt;/p&gt;\n&lt;p&gt;&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;Speaker Bio:&lt;
 /p&gt;\n&lt;p&gt;&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;Al Schaffer holds a BS Physics\, MSEE\, and MS CS.
 &amp;nbsp\; He worked for Battelle Memorial Institute\, Collins Radio\, NCR\, 
 Digital Equipment Corporation\, and HP/Agilient.&amp;nbsp\; He is a retired Pr
 ofessional Engineer (Ohio &amp;amp\; Colorado).&lt;/p&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /&gt;&lt;
 p&gt;WELCOME AND COMMENTS (15-20 minutes)&lt;/p&gt;\n&lt;p&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Visi
 on and Mission Statements&lt;/p&gt;\n&lt;p&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Survey Results of
  Technical Interests&lt;/p&gt;\n&lt;p&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Strategic Goals&lt;/p&gt;\n&lt;
 p&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Feedback and Comments&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;PRESENTATION
  ON AMES POWER PLANT (1 hour)&lt;/p&gt;
END:VEVENT
END:VCALENDAR

