BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:US/Central
BEGIN:DAYLIGHT
DTSTART:20210314T030000
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:CDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20211107T010000
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:CST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20210910T222101Z
UID:09F99746-439C-4458-BF51-375C3844408E
DTSTART;TZID=US/Central:20210709T090000
DTEND;TZID=US/Central:20210709T100000
DESCRIPTION:Systems engineering of a spacecraft project requires execution 
 of a series of subprojects to make it successful. The talk will describe t
 he processes involved in each of the steps of a successful spacecraft proj
 ect. The discussion will entail the configuration and design aspect of the
  spacecraft\, focusing on the important factors involved. The methodology 
 of subsystems’ assembly\, their integration and testing will be looked i
 nto. How does the satellite thus assembled is characterized and cleared fo
 r the launch will be the final part to be discussed?\n\nSpeaker(s): PUNEET
 \, \n\nHouston\, Texas\, United States\, Virtual: https://events.vtools.ie
 ee.org/m/276520
LOCATION:Houston\, Texas\, United States\, Virtual: https://events.vtools.i
 eee.org/m/276520
ORGANIZER:ztaqvi@gmail.com
SEQUENCE:2
SUMMARY:“Spacecraft: Configuration\, Assembly\, Design\, Integration and 
 Testing”
URL;VALUE=URI:https://events.vtools.ieee.org/m/276520
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;Systems engineering of a spacecraft projec
 t requires execution of a series of subprojects to make it successful. The
  talk will describe the&amp;nbsp\; processes involved &amp;nbsp\;in each of the st
 eps of a successful spacecraft project. The discussion will entail &amp;nbsp\;
 the configuration and design aspect of the spacecraft\, focusing on the im
 portant factors involved. The methodology of subsystems&amp;rsquo\; assembly\,
  their integration and testing will be looked into. How does the &amp;nbsp\;sa
 tellite thus assembled is characterized and cleared for the launch will be
  the final part to be discussed?&lt;/p&gt;
END:VEVENT
END:VCALENDAR

