BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:US/Central
BEGIN:DAYLIGHT
DTSTART:20220313T030000
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:CDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20211107T010000
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:CST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20211123T215837Z
UID:F45B683C-FB4C-4DF0-8763-1F7ED764B4E8
DTSTART;TZID=US/Central:20211115T173000
DTEND;TZID=US/Central:20211115T200000
DESCRIPTION:Gulf Power’s Ten Year Power Plant Site Plan 2020 – 2029 sta
 tes: NextEra Energy’s plan is to integrate Florida Power and Light (FPL)
  and Gulf Power into a single electric operating system effective on Janua
 ry 1\, 2022 after the completion of a new 161 kV transmission line (the No
 rth Florida Resiliency Connection line) that will enhance the electrical c
 onnection between the two systems. This enhanced connection will benefit c
 ustomers in both systems by better enabling the siting of clean\, reliable
 \, low cost generation\, and the transmission of energy from those facilit
 ies\, to all customers.\n\nMr. Rouillier discussed the following topics:\n
 \n- Improve (storm harden) feeders to hospitals\, utilities\, hotels\n- In
 stall underground power where economically and practically feasible. Under
 ground power expense is at least 6 times the cost of overhead power lines.
 \n- Drones are doing a very good job of finding potential failures or marg
 inal operation on transmission lines\n- Increase strength of transmission 
 lines by installing concrete poles which are 3 times stronger than usual G
 rade C wooden pole.\n- Automatic Feeder Switches (AFS) and Automatic Later
 al Switches (ALS) are improving reliability and response to faults on the 
 transmission line. The smart grid will incorporate 130 AFS and 2080 ALS in
  2021. The ALS does a fault analysis to allow the fault to clear.\n- In 20
 21 they have improved 74 miles of distribution lines by replacing 2240 exi
 sting wooden poles with concrete poles.\n\nDiscussion and Q&amp;A followed.\n\
 nSpeaker(s): Jeff Rouillier\, \n\nPENSACOLA\, Florida\, United States
LOCATION:PENSACOLA\, Florida\, United States
ORGANIZER:m.keith@ieee.org
SEQUENCE:0
SUMMARY: Gulf Power’s Resiliency Plan for Northwest Florida Panhandle
URL;VALUE=URI:https://events.vtools.ieee.org/m/291281
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;Gulf Power&amp;rsquo\;s Ten Year Power Plant S
 ite Plan 2020 &amp;ndash\; 2029 states:&amp;nbsp\; NextEra Energy&amp;rsquo\;s plan is
  to integrate Florida Power and Light (FPL) and Gulf Power into a single e
 lectric operating system effective on January 1\, 2022 after the completio
 n of a new 161 kV transmission line (the North Florida Resiliency Connecti
 on line) that will enhance the electrical connection between the two syste
 ms. This enhanced connection will benefit customers in both systems by bet
 ter enabling the siting of clean\, reliable\, low cost generation\, and th
 e transmission of energy from those facilities\, to all customers.&lt;/p&gt;\n&lt;p
 &gt;Mr. Rouillier discussed the following topics:&lt;/p&gt;\n&lt;ul&gt;\n&lt;li&gt;Improve (sto
 rm harden) feeders to hospitals\, utilities\, hotels&lt;/li&gt;\n&lt;li&gt;Install und
 erground power where economically and practically feasible. Underground po
 wer expense is at least 6 times the cost of overhead power lines.&lt;/li&gt;\n&lt;l
 i&gt;Drones are doing a very good job of finding potential failures or margin
 al operation on transmission lines&lt;/li&gt;\n&lt;li&gt;Increase strength of transmis
 sion lines by installing concrete poles which are 3 times stronger than us
 ual Grade C wooden pole.&lt;/li&gt;\n&lt;li&gt;Automatic Feeder Switches (AFS) and Aut
 omatic Lateral Switches (ALS) are improving reliability and response to fa
 ults on the transmission line. The smart grid will incorporate 130 AFS and
  2080 ALS in 2021. &amp;nbsp\;The ALS does a fault analysis to allow the fault
  to clear.&amp;nbsp\;&lt;/li&gt;\n&lt;li&gt;In 2021 they have improved 74 miles of distrib
 ution lines by replacing 2240 existing wooden poles with concrete poles.&lt;/
 li&gt;\n&lt;/ul&gt;\n&lt;p&gt;Discussion and Q&amp;amp\;A followed.&lt;/p&gt;