BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:NZ
BEGIN:DAYLIGHT
DTSTART:20210926T030000
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
RRULE:FREQ=YEARLY;BYDAY=-1SU;BYMONTH=9
TZNAME:NZDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20220403T020000
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=4
TZNAME:NZST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20220222T041148Z
UID:D3799486-6184-4A96-886C-7E623F5479A1
DTSTART;TZID=NZ:20220216T173000
DTEND;TZID=NZ:20220216T183000
DESCRIPTION:The Electrical Engineering Group are delighted to start this ye
 ar with a member presentation by Brendon Clarke\, a Principal Electrical E
 ngineer with Aecom\, on HV and LV Upgrades - High Criticality and Brownfie
 ld Sites.\n\nBrendon will present on a recent project undertaken at Palmer
 ston North Hospital that involved the establishment of a new HV supply sub
 station\, upgrades to existing HV distribution equipment and an in-situ up
 grade of a clinical services LV main switchboard in the basement of the Pa
 lmerston North Hospital.\n\nThe presentation will seek to provide insights
  into some of the more challenging aspects with upgrading infrastructure i
 n a complex brownfield environment\, and notable features implemented to r
 educe operational risks and ease future replacements.\n\nAspects include:\
 n\n- Installation challenges and delivery constraints\n- HV and LV protect
 ion coordination with embedded generation present\n- Maintainability and o
 perability design factors\n- Resiliency of supplies and closed source tran
 sfer implementation\n- Lifecycle design factors\n- Test approaches and int
 egration verification\n- DDoC&#39;s and part 1 deviation requirements\n- Manag
 ing installation and commissioning risks\n\nFollowing his presentation Bre
 ndon will be available to answer questions at the end.\n\nPalmerston North
  Hospital\, Palmerston North\, North Island\, New Zealand\, Virtual: https
 ://events.vtools.ieee.org/m/305982
LOCATION:Palmerston North Hospital\, Palmerston North\, North Island\, New 
 Zealand\, Virtual: https://events.vtools.ieee.org/m/305982
ORGANIZER:Chris.Lambell@beca.com
SEQUENCE:4
SUMMARY:ENZ EEG Presentation - MCDHB: Clinical Services - HV and LV Upgrade
 s
URL;VALUE=URI:https://events.vtools.ieee.org/m/305982
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;The Electrical Engineering Group are delig
 hted to start this year with a member presentation by Brendon Clarke\, a P
 rincipal Electrical Engineer with Aecom\, on HV and LV Upgrades - High Cri
 ticality and Brownfield Sites.&lt;/p&gt;\n&lt;p&gt;Brendon will present on a recent pr
 oject undertaken at Palmerston North Hospital that involved the establishm
 ent of a new HV supply substation\, upgrades to existing HV distribution e
 quipment and an in-situ upgrade of a clinical services LV main switchboard
  in the basement of the Palmerston North Hospital.&lt;/p&gt;\n&lt;p&gt;The presentatio
 n will seek to provide insights into some of the more challenging aspects 
 with upgrading infrastructure in a complex brownfield environment\, and no
 table features implemented to reduce operational risks and ease future rep
 lacements.&lt;/p&gt;\n&lt;p&gt;Aspects include:&lt;/p&gt;\n&lt;ul&gt;\n&lt;li&gt;Installation challenges
  and delivery constraints&lt;/li&gt;\n&lt;li&gt;HV and LV protection coordination with
  embedded generation present&lt;/li&gt;\n&lt;li&gt;Maintainability and operability des
 ign factors&lt;/li&gt;\n&lt;li&gt;Resiliency of supplies and closed source transfer im
 plementation&lt;/li&gt;\n&lt;li&gt;Lifecycle design factors&lt;/li&gt;\n&lt;li&gt;Test approaches 
 and integration verification&lt;/li&gt;\n&lt;li&gt;DDoC&#39;s and part 1 deviation require
 ments&lt;/li&gt;\n&lt;li&gt;Managing installation and commissioning risks&lt;/li&gt;\n&lt;/ul&gt;\
 n&lt;p&gt;Following his presentation Brendon will be available to answer questio
 ns at the end.&lt;/p&gt;
END:VEVENT
END:VCALENDAR

