BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:Australia/Adelaide
BEGIN:DAYLIGHT
DTSTART:20221002T030000
TZOFFSETFROM:+0930
TZOFFSETTO:+1030
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=10
TZNAME:ACDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20220403T020000
TZOFFSETFROM:+1030
TZOFFSETTO:+0930
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=4
TZNAME:ACST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20220511T031641Z
UID:777EFE91-6453-438C-B267-2FB9901CE80F
DTSTART;TZID=Australia/Adelaide:20220509T140000
DTEND;TZID=Australia/Adelaide:20220509T160000
DESCRIPTION:Barker Inlet Power Station (BIPS) is a power station in South A
 ustralia with a 210 MW quick start firming capacity. It was announced on 7
  June 2017 by AGL Energy to replace part of its ageing Torrens Island Powe
 r Stations and was commissioned on 4 November 2019. It was built alongside
  the existing station on Torrens Island in the north-western suburbs of Ad
 elaide.\nBIPS comprises 12 reciprocating engines which generate approximat
 ely 18 MW each from gas or liquid fuel. Its units can operate at full capa
 city within five minutes of start-up\, providing rapid response to changes
  in renewable generation supply and demand. Using modern and efficient tec
 hnology\, BIPS uses 28% less fuel and produces 35-50% less greenhouse gas 
 emissions than the existing Torrens A plant.\n\nNote: Visitors also need t
 heir COVID vaccination certificate uploaded during the induction.\n\nAbout
  the Presenter:\nKevin Andersen is the Project and Site Manager at Torrens
  Island Battery\, AGL.\n\nSpeaker(s): Kevin Andersen\, \n\nTorrens Island 
 \, South Australia\, Australia\, 5960\, Virtual: https://events.vtools.iee
 e.org/m/312946
LOCATION:Torrens Island \, South Australia\, Australia\, 5960\, Virtual: ht
 tps://events.vtools.ieee.org/m/312946
ORGANIZER:vanika.sharma@unisa.edu.au
SEQUENCE:8
SUMMARY:Technical Visit to Barker Inlet Power Station (BIPS)
URL;VALUE=URI:https://events.vtools.ieee.org/m/312946
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;Barker Inlet Power Station (BIPS) is a pow
 er station in South Australia with a 210 MW quick start firming capacity. 
 It was announced on 7 June 2017 by AGL Energy to replace part of its agein
 g Torrens Island Power Stations and was commissioned on 4 November 2019. I
 t was built alongside the existing station on Torrens Island in the north-
 western suburbs of Adelaide.&lt;br /&gt;BIPS comprises 12 reciprocating engines 
 which generate approximately 18 MW each from gas or liquid fuel. Its units
  can operate at full capacity within five minutes of start-up\, providing 
 rapid response to changes in renewable generation supply and demand. Using
  modern and efficient technology\, BIPS uses 28% less fuel and produces 35
 -50% less greenhouse gas emissions than the existing Torrens A plant.&lt;/p&gt;\
 n&lt;p&gt;&lt;strong&gt;Note: &lt;/strong&gt;Visitors also need their COVID vaccination cert
 ificate uploaded during the induction.&lt;/p&gt;\n&lt;p&gt;&lt;strong&gt;About the Presenter
 :&lt;/strong&gt;&lt;br /&gt;Kevin Andersen is the Project and Site Manager at Torrens 
 Island Battery\, AGL.&lt;/p&gt;\n&lt;p&gt;&lt;br /&gt;&lt;br /&gt;&lt;/p&gt;\n&lt;p&gt;&amp;nbsp\;&lt;/p&gt;
END:VEVENT
END:VCALENDAR

