BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
DTSTART:20100314T030000
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:MDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20101107T010000
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:MST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20120404T154028Z
UID:195F66F2-0BEF-102E-8DFC-0050568D3657
DTSTART;TZID=America/Denver:20101008T113000
DTEND;TZID=America/Denver:20101008T123000
DESCRIPTION:The IEEE Pikes Peak Section Professional Activities Committee f
 or Engineers\, the IEEE Pikes Peak Section\, and the Power and Energy Soci
 ety are pleased to present: â€œTour of the Fort Carson 2 MW Solar Arra
 yâ€ When: Friday\, Oct. 8\, 11:30-12:30 Where: Fort Carson main gate 
 (Gate 1) off of highway 115. Gather at the front parking lot next to the K
 it Carson statue and Warrior Memorial Wall for a Ft. Carson bus to transpo
 rt us to the solar array site. This talk is open to all IEEE members. The 
 group size is limited to 20 participants. You may bring a sack lunch to ea
 t during the presentation. Solar Array Details: â€¢ $13 million 2 MW a
 rray generates ~3\,200 MWh/year â€¢ Largest array in the Army to date.
  Was the 7th largest in the country when it was completed. â€¢ Array i
 s ground-mounted\, fixed-tilt covering ~12 acres\, 6.5 of which cover the 
 former landfill â€¢ First Solar thin film PV technology (9.5% efficien
 cy) â€¢ Fixed\, non-escalating energy rate of $0.055/kwh for 20 years 
 â€¢ Western Area Power Administration is contracting agent â€¢ Pro
 ject serves 2.0% of Ft. Carsonâ€™s load or the equivalent of 540 home
 s. â€¢ Project completion date was 28 December 2007 â€¢ The PV pan
 els carry a 25-year warranty â€¢ Construction on a former landfill pro
 vides a unique reuse opportunity for an area otherwise limited in use â
 €¢ Army funded the $650 thousand landfill cover to comply with Colorado
  Department of Public Health and Environment\, state regulatory agency\, c
 leanup regulations â€¢ Fort Carson continues to be responsible for lan
 dfill monitoring and maintenance Tour and technical discussion: â€¢ Le
 ad by Vince Guthrie\, Fort Carson Directorate of Public Works Utility Prog
 rams Manager\, CEM Registration: Please register online or contact Vincent
  at y.yang@ieee.org for help.\n\nSpeaker(s): \, \, \, \n\nColorado Springs
 \, Colorado\, United States
LOCATION:Colorado Springs\, Colorado\, United States
ORGANIZER:
SEQUENCE:1
SUMMARY:Fort Carson 2 MW Solar Array Tour
URL;VALUE=URI:https://events.vtools.ieee.org/m/3139
X-ALT-DESC:Description: &lt;br /&gt;The IEEE Pikes Peak Section Professional Acti
 vities Committee for Engineers\, the IEEE Pikes Peak Section\, and the Pow
 er and Energy Society are pleased to present:\n\nâ€œTour of the Fort C
 arson 2 MW Solar Arrayâ€\n\n&lt;!!The group size is limited to 20 partic
 ipants!!&gt;\n\nWhen:  Friday\, Oct. 8\, 11:30-12:30\n\nWhere:  Fort Carson m
 ain gate (Gate 1) off of highway 115.  Gather at the front parking lot nex
 t to the Kit Carson statue and Warrior Memorial Wall for a Ft. Carson bus 
 to transport us to the solar array site.\n\nThis talk is open to all IEEE 
 members.  The group size is limited to 20 participants.  You may bring a s
 ack lunch to eat during the presentation. \n\nSolar Array Details:\n\nâ
 €¢	$13 million 2 MW array generates ~3\,200 MWh/year\nâ€¢	Largest a
 rray in the Army to date.  Was the 7th largest in the country when it was 
 completed.\nâ€¢	Array is ground-mounted\, fixed-tilt covering ~12 acre
 s\, 6.5 of which cover the former landfill\nâ€¢	First Solar thin film 
 PV technology (9.5% efficiency)\nâ€¢	Fixed\, non-escalating energy rat
 e of $0.055/kwh for 20 years\nâ€¢	Western Area Power Administration is
  contracting agent\nâ€¢	Project serves 2.0% of Ft. Carsonâ€™s loa
 d or the equivalent of 540 homes. \nâ€¢	Project completion date was 28
  December 2007\nâ€¢	The PV panels carry a 25-year warranty\nâ€¢	Co
 nstruction on a former landfill provides a unique reuse opportunity for an
  area otherwise limited in use\nâ€¢	Army funded the $650 thousand land
 fill cover to comply with Colorado Department of Public Health and Environ
 ment\, state regulatory agency\, cleanup regulations \nâ€¢	Fort Carson
  continues to be responsible for landfill monitoring and maintenance\n\nTo
 ur and technical discussion:\n\nâ€¢	Lead by Vince Guthrie\, Fort Carso
 n Directorate of Public Works Utility Programs Manager\, CEM\n\nRegistrati
 on:\nPlease register online or contact Vincent at y.yang@ieee.org for help
 . \n
END:VEVENT
END:VCALENDAR

