BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
DTSTART:20220313T030000
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:EDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20221106T010000
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:EST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20220914T151050Z
UID:A63FEB68-08AB-4168-B3EB-105562D9B44D
DTSTART;TZID=America/New_York:20220816T180000
DTEND;TZID=America/New_York:20220816T210000
DESCRIPTION:This presentation will take us through the steps utilized to mi
 tigate the hazardous conditions posed by aging equipment\, unstable subsur
 face\, and deteriorating infrastructure at the Amesbury #5 Substation in A
 mesbury\, MA\, National Grid’s territory. One of the many challenges fac
 ing the electric utility industry in the Northeast US is the maintenance a
 nd replacement of equipment which is due for retirement or replacement. Th
 e case study of the Amesbury #5 Substation is no different. We will discus
 s the background of the civil challenges that kicked off the project as we
 ll as the engineering studies and mitigation strategies to prevent equipme
 nt failure at the site. We will also cover the electrical design process u
 sed to maintain electric service reliability to customers served by the su
 bstation while creating a solution that removed the imminent risk.\n\nMeet
 ing Login:\n\nhttps:/teams.microsoft.com/l/meetup-join/19*3ameeting_NWVhOD
 dlYjMtYzY4NS00MGQ5LTliM2MtMmRjZjI5NjUxOWM3*40thread.v2/0?context=*7b*22Tid
 *22*3a*22b6915f8a-d838-47d0-931a-40297c4931bd*22*2c*22Oid*22*3a*2211590b6b
 -8169-47dc-8029-c807281e8bd6*22*7d__\;JSUlJSUlJSUlJSUlJSUl!!B3hxM_NYsQ!w4Z
 zNS8sr9Cy2KiW1eiHZTXo8_ofQ1EBCYdny2CtIu62-VEEQM5TbGnOmp9ZGE99IraTj7P4iJWkZ
 3ARRvuCm_YtkH913b1YM1LvNQ$\n\nCo-sponsored by: Boston PES\n\nSpeaker(s): J
 eff Cahill\, \n\nVirtual: https://events.vtools.ieee.org/m/321701
LOCATION:Virtual: https://events.vtools.ieee.org/m/321701
ORGANIZER:Julia.Cahill@nationalgrid.com
SEQUENCE:4
SUMMARY:National Grid’s Amesbury #5 Transformer Removal: A Case Study
URL;VALUE=URI:https://events.vtools.ieee.org/m/321701
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;&lt;span style=&quot;font-size: 9.0pt\; line-heigh
 t: 150%\; font-family: &#39;Helvetica&#39;\,sans-serif\; color: #505050\;&quot;&gt;This pr
 esentation will take us through the steps utilized to mitigate the hazardo
 us conditions posed by aging equipment\, unstable subsurface\, and deterio
 rating infrastructure at the Amesbury #5 Substation in Amesbury\, MA\, Nat
 ional Grid&amp;rsquo\;s territory. One of the many challenges facing the elect
 ric utility industry in the Northeast US is the maintenance and replacemen
 t of equipment which is due for retirement or replacement. The case study 
 of the Amesbury #5 Substation is no different. We will discuss the backgro
 und of the civil challenges that kicked off the project as well as the eng
 ineering studies and mitigation strategies to prevent equipment failure at
  the site. We will also cover the electrical design process used to mainta
 in electric service reliability to customers served by the substation whil
 e creating a solution that removed the imminent risk.&lt;/span&gt;&lt;span style=&quot;f
 ont-size: 12.0pt\; line-height: 150%\; font-family: &#39;Helvetica&#39;\,sans-seri
 f\; color: #505050\;&quot;&gt;&lt;br /&gt;&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;&lt;span style=&quot;font-size: 9.0pt\
 ; line-height: 150%\; font-family: &#39;Helvetica&#39;\,sans-serif\; color: #50505
 0\;&quot;&gt;Meeting Login:&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;&lt;span style=&quot;font-size: 9.0pt\; line-he
 ight: 150%\; font-family: &#39;Helvetica&#39;\,sans-serif\; color: #505050\;&quot;&gt;http
 s:/teams.microsoft.com/l/meetup-join/19*3ameeting_NWVhODdlYjMtYzY4NS00MGQ5
 LTliM2MtMmRjZjI5NjUxOWM3*40thread.v2/0?context=*7b*22Tid*22*3a*22b6915f8a-
 d838-47d0-931a-40297c4931bd*22*2c*22Oid*22*3a*2211590b6b-8169-47dc-8029-c8
 07281e8bd6*22*7d__\;JSUlJSUlJSUlJSUlJSUl!!B3hxM_NYsQ!w4ZzNS8sr9Cy2KiW1eiHZ
 TXo8_ofQ1EBCYdny2CtIu62-VEEQM5TbGnOmp9ZGE99IraTj7P4iJWkZ3ARRvuCm_YtkH913b1
 YM1LvNQ$&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;&amp;nbsp\;&lt;/p&gt;
END:VEVENT
END:VCALENDAR