BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
DTSTART:20220313T030000
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:MDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20221106T010000
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:MST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20221021T143513Z
UID:DE0616AF-18ED-4530-827F-F5371D0B758D
DTSTART;TZID=America/Denver:20221020T183000
DTEND;TZID=America/Denver:20221020T203000
DESCRIPTION:&quot;Webb unfolded&quot;\n\nWe will present the architecture of the Webb
  telescope that was developed to both achieve the desired science goals as
  well as be able to be launched into space. This necessitated a large depl
 oyable telescope that is compactly folded into the stowed launch configura
 tion in the rocket fairing\, and then unfolded to re-build the telescope i
 n space. The design also provides the passive cooling of the telescope to 
 be able to operate at the infrared wavelengths needed to enable the scienc
 e. The accuracy of the alignments after deployment and shifts from the coo
 l down was not quite to the alignment necessary for the desired performanc
 e.\n\nThe second part of the presentation will describe the development an
 d use of the Wave Front Sensing and Control process that brought the teles
 cope from the initial rough alignment after deployment and cool-down into 
 the final alignment. This was done by efficiently using imagery from the s
 cience instruments without requiring a separate metrology system that woul
 d have added mass and complexity to the system.\n\nThe success of the Wave
  Front Sensing and Control process has resulted in the exquisite images an
 d spectra that are unfolding daily.\n\nSpeaker(s): Paul Lightsey\, \n\nAge
 nda: \n6:30 Brief announcements and business meeting\n\n6:45 Presentation\
 n\nRoom: 230\, Bldg: Elevations Credit Union\, 221 E Mountain Ave\, 2nd Fl
 oor\, Fort Collins\, Colorado\, United States\, 80524\, Virtual: https://e
 vents.vtools.ieee.org/m/322892
LOCATION:Room: 230\, Bldg: Elevations Credit Union\, 221 E Mountain Ave\, 2
 nd Floor\, Fort Collins\, Colorado\, United States\, 80524\, Virtual: http
 s://events.vtools.ieee.org/m/322892
ORGANIZER:Mag10co@hotmail.com
SEQUENCE:9
SUMMARY:James Webb Telescope Wavefront Sensing and Control-The Great Unfold
 ing
URL;VALUE=URI:https://events.vtools.ieee.org/m/322892
X-ALT-DESC:Description: &lt;br /&gt;&lt;p style=&quot;margin: 0in\; background: white\;&quot;&gt;
 &lt;span style=&quot;font-size: 11.0pt\; font-family: &#39;Calibri&#39;\,sans-serif\; colo
 r: #1f497d\;&quot;&gt;&quot;Webb unfolded&quot;&lt;/span&gt;&lt;/p&gt;\n&lt;p style=&quot;margin: 0in\; backgrou
 nd: white\;&quot;&gt;&lt;span style=&quot;font-size: 11.0pt\; font-family: &#39;Calibri&#39;\,sans
 -serif\; color: #1f497d\;&quot;&gt;We will present the architecture of the Webb te
 lescope that was developed to both achieve the desired science goals as we
 ll as be able to be launched into space. This necessitated a large deploya
 ble telescope that is compactly folded into the stowed launch configuratio
 n in the rocket fairing\, and then unfolded to re-build the telescope in s
 pace. The design also provides the passive cooling of the telescope to be 
 able to operate at the infrared wavelengths needed to enable the science. 
 The accuracy of the alignments after deployment and shifts from the cool d
 own was not quite to the alignment necessary for the desired performance. 
 &lt;/span&gt;&lt;/p&gt;\n&lt;p style=&quot;margin: 0in\; background: white\;&quot;&gt;&lt;span style=&quot;fon
 t-size: 11.0pt\; font-family: &#39;Calibri&#39;\,sans-serif\; color: #1f497d\;&quot;&gt;Th
 e second part of the presentation will describe the development and use of
  the Wave Front Sensing and Control process that brought the telescope fro
 m the initial rough alignment after deployment and cool-down into the fina
 l alignment. This was done by efficiently using imagery from the science i
 nstruments without requiring a separate metrology system that would have a
 dded mass and complexity to the system. &lt;/span&gt;&lt;/p&gt;\n&lt;p style=&quot;margin: 0in
 \; background: white\;&quot;&gt;&lt;span style=&quot;font-size: 11.0pt\; font-family: &#39;Cal
 ibri&#39;\,sans-serif\; color: #1f497d\;&quot;&gt;The success of the Wave Front Sensin
 g and Control process has resulted in the exquisite images and spectra tha
 t are unfolding daily.&lt;/span&gt;&lt;/p&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /&gt;&lt;p&gt;6:30 Brief a
 nnouncements and business meeting&lt;/p&gt;\n&lt;p&gt;6:45 Presentation&lt;/p&gt;
END:VEVENT
END:VCALENDAR

