BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:Europe/Brussels
BEGIN:DAYLIGHT
DTSTART:20230326T030000
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
RRULE:FREQ=YEARLY;BYDAY=-1SU;BYMONTH=3
TZNAME:CEST
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20231029T020000
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
RRULE:FREQ=YEARLY;BYDAY=-1SU;BYMONTH=10
TZNAME:CET
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20230428T092515Z
UID:4362E0A2-548B-413F-AB51-8AAA2FB4B8E9
DTSTART;TZID=Europe/Brussels:20230427T090000
DTEND;TZID=Europe/Brussels:20230427T180000
DESCRIPTION:The Oosterweel connection is part of &#39;The Great Connection&#39;. &#39;T
 he Great Connection&#39; is the project for the future\nwith which the Flemish
  government is building a city and region where it is good to live\, work\
 , do business and visit.\nBy building the Oosterweel\, the Antwerp ring ro
 ad\, the R1\, will be made closed completely in the north with an\nadditio
 nal river Scheldt crossing next to the existing Kennedy tunnel and the Lie
 fkenshoek tunnel.\n\nThe works on the Oosterweel connection are the larges
 t infrastructure works ever in Belgium and have a total cost\nof approxima
 tely 4.5 billion euros.\n\nGiven its large size\, the total project has be
 en split into 5 project components\n1) Left Bank\n2) Scheldt tunnel\n3) Oo
 sterweel Junction\n4) Channel tunnels\n5) R1-North\n\nREGISTRATION by send
 ing email to: C.G.M. (Kees) van ’t Klooster\, Secretary IEEE Benelux LMA
 G\, before 14 April 2023.\n\n(KEEP THE DATES: EXACT TIMES TO BE COMMUNICAT
 ED LATER!)\n2.12.0.0\n2.12.0.0\n2.12.0.0\n2.12.0.0\n2.12.0.0\n\nAgenda: \n
 (EXACT STARTING AND ENDING TIME WILL BE COMMUNICATED LATER)\n\nDuring this
  visit you will receive an explanation (approximately 45 minutes) about th
 e how and why of this project\,\nthe state of affairs\, the future view an
 d the expected planning. By means of a site safari (approx. 2 hours) over 
 the\nLinkeroever-Zwijndrecht site you get a look behind the scenes of thes
 e immense works.\n2.12.0.0\n2.12.0.0\n2.12.0.0\n2.12.0.0\n2.12.0.0\n\nAntw
 erp\, Antwerpen\, Belgium
LOCATION:Antwerp\, Antwerpen\, Belgium
ORGANIZER:Dirk.rabaey@telenet.be
SEQUENCE:2
SUMMARY:Site safari: The Oosterweel connection (Antwerp - Belgium)
URL;VALUE=URI:https://events.vtools.ieee.org/m/351183
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;The Oosterweel connection is part of &#39;The 
 Great Connection&#39;. &#39;The Great Connection&#39; is the project for the future&lt;br
  /&gt;with which the Flemish government is building a city and region where i
 t is good to live\, work\, do business and visit.&lt;br /&gt;By building the Oos
 terweel\, the Antwerp ring road\, the R1\, will be made closed completely 
 in the north with an&lt;br /&gt;additional river Scheldt crossing next to the ex
 isting Kennedy tunnel and the Liefkenshoek tunnel.&lt;/p&gt;\n&lt;p&gt;The works on th
 e Oosterweel connection are the largest infrastructure works ever in Belgi
 um and have a total cost&lt;br /&gt;of approximately 4.5 billion euros.&lt;/p&gt;\n&lt;p&gt;
 &lt;br /&gt;Given its large size\, the total project has been split into 5 proje
 ct components&lt;br /&gt;1) Left Bank&lt;br /&gt;2) Scheldt tunnel&lt;br /&gt;3) Oosterweel 
 Junction&lt;br /&gt;4) Channel tunnels&lt;br /&gt;5) R1-North&lt;/p&gt;\n&lt;p&gt;&lt;strong&gt;REGISTRA
 TION&lt;/strong&gt; by sending email to: C.G.M. (Kees) &amp;nbsp\;van &amp;rsquo\;t Kloo
 ster\, Secretary IEEE Benelux LMAG\,&amp;nbsp\; before 14 April 2023.&lt;/p&gt;\n&lt;p&gt;
 (KEEP THE DATES: EXACT TIMES TO BE COMMUNICATED LATER!)&lt;/p&gt;\n&lt;div id=&quot;scon
 nect-is-installed&quot; style=&quot;display: none\;&quot;&gt;2.12.0.0&lt;/div&gt;\n&lt;div id=&quot;sconne
 ct-is-installed&quot; style=&quot;display: none\;&quot;&gt;2.12.0.0&lt;/div&gt;\n&lt;div id=&quot;sconnect
 -is-installed&quot; style=&quot;display: none\;&quot;&gt;2.12.0.0&lt;/div&gt;\n&lt;div id=&quot;sconnect-i
 s-installed&quot; style=&quot;display: none\;&quot;&gt;2.12.0.0&lt;/div&gt;\n&lt;div id=&quot;sconnect-is-
 installed&quot; style=&quot;display: none\;&quot;&gt;2.12.0.0&lt;/div&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /
 &gt;&lt;p&gt;(EXACT STARTING AND ENDING TIME WILL BE COMMUNICATED LATER)&lt;/p&gt;\n&lt;p&gt;Du
 ring this visit you will receive an explanation (approximately 45 minutes)
  about the how and why of this project\,&lt;br /&gt;the state of affairs\, the f
 uture view and the expected planning. By means of a site safari (approx. 2
  hours) over the&lt;br /&gt;Linkeroever-Zwijndrecht site you get a look behind t
 he scenes of these immense works.&lt;/p&gt;\n&lt;div id=&quot;sconnect-is-installed&quot; sty
 le=&quot;display: none\;&quot;&gt;2.12.0.0&lt;/div&gt;\n&lt;div id=&quot;sconnect-is-installed&quot; style
 =&quot;display: none\;&quot;&gt;2.12.0.0&lt;/div&gt;\n&lt;div id=&quot;sconnect-is-installed&quot; style=&quot;
 display: none\;&quot;&gt;2.12.0.0&lt;/div&gt;\n&lt;div id=&quot;sconnect-is-installed&quot; style=&quot;di
 splay: none\;&quot;&gt;2.12.0.0&lt;/div&gt;\n&lt;div id=&quot;sconnect-is-installed&quot; style=&quot;disp
 lay: none\;&quot;&gt;2.12.0.0&lt;/div&gt;
END:VEVENT
END:VCALENDAR

