BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
DTSTART:20150308T030000
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:MDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20151101T010000
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:MST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20150825T223505Z
UID:F8EF648F-30C3-11E5-A923-0050568D2FB3
DTSTART;TZID=America/Denver:20150827T090000
DTEND;TZID=America/Denver:20150827T110000
DESCRIPTION:The Pikes Peak Chapter of the IEEE Power and Energy Society inv
 ites you to tour NextEra Energy Inc. and view their wind energy facilities
  located in Limon\, CO.\n\nNextEra Energy\, Inc. is a leading clean energy
  company with consolidated revenues of approximately $17.0 billion\, appro
 ximately 44\,900 megawatts of generating capacity\, which includes megawat
 ts associated with noncontrolling interests related to NextEra Energy Part
 ners\, LP (NYSE: NEP)\, and approximately 13\,800 employees in 27 states a
 nd Canada as of year-end 2014.\n\nThe tour will also include a technical p
 resentation discussing topics such as:\n\n-  Wind availability to output c
 urves\n-  Wind speed history\n-  Production/capacity of the wind farm\n-  
 Collector system\n-  How is it operated?\n-  Who dispatches the power?\n- 
  Operating history\n-  Building construction and permitting process\n-  En
 vironmental permitting (studies)\n-  Maintenance cycle process\n-  Subsidi
 es? royalties?\n-  How is it backed up as variable generation?\n\nPersonal
  Protection Equipment (PPE) is required: Hard hat\, safety glasses and clo
 sed toed shoes. If you need any of the required PPE\, please state what is
  needed in your RSVP response.\n\nSpeaker(s): \, \, \, \n\nAgenda: \n8:50a
 m: Arrive at the Operations &amp; Maintenance Building located 1 mile east fro
 m the Northwest corner of Co Rd 3p and 71.\n\n9:00am-10am: Technical Prese
 ntation\n\n10am-11am: Site Tour\n\nBldg: NextEra Operations and Maintenanc
 e Building\, 22085 County Rd 3P\, Limon\, Colorado\, United States\, 80828
LOCATION:Bldg: NextEra Operations and Maintenance Building\, 22085 County R
 d 3P\, Limon\, Colorado\, United States\, 80828
ORGANIZER:mlong@csu.org
SEQUENCE:3
SUMMARY:IEEE PES Pikes Peak Section Wind Tour with NextEra Energy Inc.
URL;VALUE=URI:https://events.vtools.ieee.org/m/35357
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;The Pikes 
 Peak Chapter of the IEEE Power and Energy Society invites you to tour Next
 Era Energy Inc. and view their wind energy facilities located in Limon\, C
 O.&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;NextEra Energy\, Inc. is
  a leading clean energy company with consolidated revenues of approximatel
 y $17.0 billion\, approximately 44\,900 megawatts of generating capacity\,
  which includes megawatts associated with noncontrolling interests related
  to NextEra Energy Partners\, LP (NYSE: NEP)\, and approximately 13\,800 e
 mployees in 27 states and Canada as of year-end 2014.&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;&lt;span
  style=&quot;font-size: 14pt\;&quot;&gt;The tour will also include a technical presenta
 tion discussing topics such as:&lt;/span&gt;&lt;/p&gt;\n&lt;ul&gt;\n&lt;li&gt;&lt;span style=&quot;font-si
 ze: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Wind availability to ou
 tput curves&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp
 \; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Wind speed history&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span style=
 &quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Production/capa
 city of the wind farm&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;&amp;nb
 sp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Collector system&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;spa
 n style=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;How is 
 it operated?&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbs
 p\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Who dispatches the power?&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;spa
 n style=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Operati
 ng history&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\
 ; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Building construction and permitting process&lt;/spa
 n&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp
 \; &amp;nbsp\;Environmental permitting (studies)&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span style=
 &quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Maintenance cyc
 le process&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\
 ; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;Subsidies? royalties?&lt;/span&gt;&lt;/li&gt;\n&lt;li&gt;&lt;span styl
 e=&quot;font-size: 14pt\;&quot;&gt;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;How is it bac
 ked up as variable generation?&lt;/span&gt;&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p&gt;&lt;span style=&quot;font-si
 ze: 14pt\;&quot;&gt;Personal Protection Equipment (PPE) is required: Hard hat\, sa
 fety glasses and closed toed shoes. If you need any of the required PPE\, 
 please state what is needed in your RSVP response.&lt;/span&gt;&lt;/p&gt;&lt;br /&gt;&lt;br /&gt;A
 genda: &lt;br /&gt;&lt;p&gt;&lt;span style=&quot;font-size: 14pt\;&quot;&gt;8:50am: Arrive at the Oper
 ations &amp;amp\; Maintenance Building located 1 mile east from the Northwest 
 corner of Co Rd 3p and 71.&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;&lt;span style=&quot;font-size: 18.66666
 60308838px\;&quot;&gt;9:00am-10am: Technical Presentation&lt;/span&gt;&lt;/p&gt;\n&lt;p&gt;&lt;span sty
 le=&quot;font-size: 18.6666660308838px\;&quot;&gt;10am-11am: Site Tour&lt;/span&gt;&lt;/p&gt;
END:VEVENT
END:VCALENDAR

