BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
DTSTART:20160313T030000
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:CDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20151101T010000
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:CST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20160302T225648Z
UID:00F9A57A-CAC3-11E5-A050-0050568D2FB3
DTSTART;TZID=America/Chicago:20160303T170000
DTEND;TZID=America/Chicago:20160303T183000
DESCRIPTION:This will be a tour of the recently renovated combined heat and
  power plant that serves the UW campus.\n\nAdvance Registration is Require
 d The tour can not accomodate more than 30 people.\n\nThere are no elevato
 rs so attendees will need to be able to climb one or two flights of stairs
 .\n\nThe original plant was constructed in late 1950’s as a heating plan
 t with three coal-fired boilers to supply steam to campus buildings for he
 ating. A fourth boiler was added in the early 1960’s. A plant expansion 
 in the mid 1960’s added a fifth boiler (natural gas) and the first two c
 hillers for campus cooling. The current 9.7 MW steam turbine generator was
  added in mid 1990’s. The plant was extensively rebuilt between 2011 and
  2013 to replace the coal-fired boilers with gas-fired units and make othe
 r improvements and additions including:\n\n- Water treatment equipment ins
 tallation\n- Upgrades to feed water and condensate collection systems\n- N
 ew air compressors\n- Upgrade to digital controls for both campus heating/
 cooling plants\n- Electrical system upgrades and additions\n- New 13.8-KV 
 switchyard\n- Fire protection for the existing plant and expansion\n- New 
 six-cell\, 50\,000-GPM cooling tower\n- Construction of a new control room
 \n\nSpeaker(s): \, \, \, \n\nAgenda: \nBring head phones if you have them.
  UW will provide a wireless receiver and a single earbud for anyone who do
 esn’t bring their own.\n\nParking: The map provided by the link in the &quot;
 Where&quot; box above shows UW parking Lots 33 and 45. After 4:30 PM\, both of 
 these lots are free so attendees can park in either lot depending on avail
 ability.\n\n4:55 PM: Gather at the entrance indicated on the linked map an
 d wait to be admitted. If the weather is bad\, we will be admitted a littl
 e earlier. The entrance is adjacent to the plant’s parking lot on Mills 
 Street just south of Dayton Street. Anyone arriving after this door is loc
 ked will need to walk around the plant to the pedestrian gate on Charter S
 treet and buzz the control room for entrance into the plant.\n\n5:00 - 6:3
 0 Tour: The tour will last approximately an hour and a half depending on q
 uestions and inclusion of a tour of the roof. (See below)\n\nTour Stops: (
 order subject to change)\n\n- Control room\n- 225\,000 Lb/Hr natural gas b
 oilers\n- Natural gas meter pit\n- New utility tunnel and steam exit locat
 ions\n- Water treatment plant\n- Steam turbine generator\n- Campus cooling
  chillers and pumping systems\n- Fuel oil tank (back-up fuel to natural ga
 s)\n- Optional roof tour - If weather permits\, those who wish to climb th
 e additional stairs to the roof can see the boiler stacks\, and the coolin
 g towers for the boiler feedwater\, and the chiller.\n\nOverview Map and A
 dditional Parking\n\nThe map below shows an overview of the area. The poin
 t marked is UW parking lot 45 across Mills St. from the plant. Lots 45 and
  33 are accessible by turning South on Mills St. from from Univeristy Aven
 ue Westbound or Johnson St. Eastbound. You can also turn North on Mills St
 . from Regent St\, just South of the area shown. If parking lots 33 and 45
  are full\, there may be space available in lot 54 behind the UW Geology M
 useum on Charter St. across from the South end of the plant. Go around the
  block to Charter St. by going South on Mills St.\, East on Spring St. and
  North on Charter St. Lot 54 has linked sections that may not be visible f
 rom the street.\n\nBldg: UW Charter Street Power Plant\, 117 N. Mills St.\
 , Madison\, Wisconsin\, United States
LOCATION:Bldg: UW Charter Street Power Plant\, 117 N. Mills St.\, Madison\,
  Wisconsin\, United States
ORGANIZER:cjc1ecom@gmail.com
SEQUENCE:14
SUMMARY:Tour of UW Charter Street Heating and Cooling Plant
URL;VALUE=URI:https://events.vtools.ieee.org/m/38289
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;This will be a tour of the recently renova
 ted combined heat and power plant that serves the UW&amp;nbsp\; campus.&lt;/p&gt;\n&lt;
 p&gt;&lt;strong&gt;Advance Registration is Required&lt;/strong&gt; The tour can not accom
 odate more than 30 people.&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;&lt;strong&gt;There are no elevators s
 o attendees will need to be able to climb one or two flights of stairs.&lt;/s
 trong&gt;&lt;/p&gt;\n&lt;p&gt;The original plant was constructed in late 1950&amp;rsquo\;s as
  a heating plant with three coal-fired boilers to supply steam to campus b
 uildings for heating. A fourth boiler was added in the early 1960&amp;rsquo\;s
 . A plant expansion in the mid 1960&amp;rsquo\;s added a fifth boiler (natural
  gas) and the first two chillers for campus cooling. The current 9.7 MW st
 eam turbine generator was added in mid 1990&amp;rsquo\;s. The plant was extens
 ively rebuilt between 2011 and 2013 to replace the coal-fired boilers with
  gas-fired units and make other improvements and additions including:&lt;/p&gt;\
 n&lt;ul&gt;\n&lt;li&gt;Water treatment equipment installation&lt;/li&gt;\n&lt;li&gt;Upgrades to fe
 ed water and condensate collection systems&lt;/li&gt;\n&lt;li&gt;New air compressors&lt;/
 li&gt;\n&lt;li&gt;Upgrade to digital controls for both campus heating/cooling plant
 s&lt;/li&gt;\n&lt;li&gt;Electrical system upgrades and additions&lt;/li&gt;\n&lt;li&gt;New 13.8-KV
  switchyard&lt;/li&gt;\n&lt;li&gt;Fire protection for the existing plant and expansion
 &lt;/li&gt;\n&lt;li&gt;New six-cell\, 50\,000-GPM cooling tower&lt;/li&gt;\n&lt;li&gt;Construction
  of a new control room&lt;/li&gt;\n&lt;/ul&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /&gt;&lt;p&gt;&lt;strong&gt;Bri
 ng head phones if you have them.&amp;nbsp\;&lt;/strong&gt;UW will provide a wireless
  receiver and a single earbud for anyone who doesn&amp;rsquo\;t bring their ow
 n.&lt;/p&gt;\n&lt;p&gt;&lt;strong&gt;Parking:&lt;/strong&gt;&amp;nbsp\;The map provided by the link in
  the &quot;Where&quot; box above shows UW parking Lots 33 and 45. After 4:30 PM\, bo
 th of these lots are free so attendees can park in either lot depending on
  availability.&lt;/p&gt;\n&lt;p&gt;&lt;strong&gt;4:55 PM:&lt;/strong&gt;&amp;nbsp\;&lt;strong&gt;Gather at t
 he entrance&lt;/strong&gt; indicated on the linked map and wait to be admitted. 
 If the weather is bad\, we will be admitted a little earlier. The entrance
  is adjacent to the plant&amp;rsquo\;s parking lot on Mills Street just south 
 of Dayton Street. &lt;strong&gt;Anyone arriving after this door is locked will n
 eed to walk around the plant to the pedestrian gate on Charter Street and 
 buzz the control room for entrance into the plant.&lt;/strong&gt;&lt;/p&gt;\n&lt;p&gt;&lt;stron
 g&gt;5:00 - 6:30&amp;nbsp\;&lt;/strong&gt;&lt;strong&gt;Tour:&amp;nbsp\;&lt;/strong&gt;The tour will la
 st approximately an hour and a half depending on questions and inclusion o
 f a tour of the roof. (See below)&lt;/p&gt;\n&lt;p&gt;&lt;strong&gt;Tour Stops:&amp;nbsp\;&lt;/stro
 ng&gt;(order subject to change)&lt;/p&gt;\n&lt;ul&gt;\n&lt;li&gt;Control room&lt;/li&gt;\n&lt;li&gt;225\,00
 0 Lb/Hr natural gas boilers&lt;/li&gt;\n&lt;li&gt;Natural gas meter pit&lt;/li&gt;\n&lt;li&gt;New 
 utility tunnel and steam exit locations&lt;/li&gt;\n&lt;li&gt;Water treatment plant&lt;/l
 i&gt;\n&lt;li&gt;Steam turbine generator&lt;/li&gt;\n&lt;li&gt;Campus cooling chillers and pump
 ing systems&lt;/li&gt;\n&lt;li&gt;Fuel oil tank (back-up fuel to natural gas)&lt;/li&gt;\n&lt;l
 i&gt;Optional roof tour - If weather permits\, those who wish to climb the ad
 ditional stairs to the roof can see the boiler stacks\, and the cooling to
 wers for the boiler feedwater\, and the chiller.&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p&gt;&lt;strong&gt;O
 verview Map and Additional Parking&lt;/strong&gt;&lt;/p&gt;\n&lt;p&gt;The map below shows an
  overview of the area. The point marked is UW parking lot 45 across Mills 
 St. from the plant. Lots 45 and 33 are&amp;nbsp\;accessible by turning South o
 n Mills St. from from Univeristy Avenue Westbound or Johnson St. Eastbound
 . You can also turn North on Mills St. from Regent St\, just South of the 
 area shown. If parking lots 33 and 45 are full\, there may be space availa
 ble in lot 54 behind the UW Geology Museum on Charter St. across from the 
 South end of the plant. Go around the block to Charter St. by going South 
 on Mills St.\, East on Spring St. and North on Charter St. Lot 54 has link
 ed sections that may not be visible from the street.&lt;/p&gt;
END:VEVENT
END:VCALENDAR

