BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:US/Eastern
BEGIN:DAYLIGHT
DTSTART:20170312T030000
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:EDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20161106T010000
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:EST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20161004T035713Z
UID:10EDACC7-89DB-11E6-A7C6-0050568D7F66
DTSTART;TZID=US/Eastern:20161116T073000
DTEND;TZID=US/Eastern:20161117T163000
DESCRIPTION:Utility-scale transformers are custom designed-built for specif
 ic transmission and distribution system requirements. There are many diffe
 rent design approaches\, materials and manufacturing processes that can be
  used to produce utility-scale transformers. These differences can result 
 in varying levels of system performance\, power transfer efficiency\, faul
 t tolerance\, equipment life\, cost and the like. This two-day workshop wi
 ll provide instruction on the many options available for the design and ma
 nufacture of utility-scale transformers. It will cover TAPS\, Quality Assu
 rance inspection (Pre-tanking and FAT Test) and receiving\, assembling\, i
 nstall and test of transformer at site. It will also provide insight into 
 specifying the design and manufacture of transformers that are most approp
 riate for specific system requirements.\n\nThe workshop fee includes break
 fast\, morning refreshments and lunch.\n\nCo-sponsored by: Central Hudson 
 Gas &amp; Electric\n\nSpeaker(s): Ronnie Minhaz\, \n\nAgenda: \nDay 1: Novembe
 r 16\, 2016\n\nP1: Electrical &amp; Mechanical Design\n\nP2: Taps\n\nP3: Trans
 former Manufacturing Process\n\nDay 2: November 17\, 2016\n\nP4: Pre-tanki
 ng Inspection\n\nP5: Factory Acceptance Test Inspection\n\nP6: Recieving\,
  Assembling\, Install &amp; Test\n\nP7: Transformer Specification Preparation\
 n\nRoom: North Auditorium\, Bldg: Human Resources\, Central Hudson Gas &amp; E
 lectric\, 284 South Avenue\, Poughkeepsie\, New York\, United States\, 126
 01
LOCATION:Room: North Auditorium\, Bldg: Human Resources\, Central Hudson Ga
 s &amp; Electric\, 284 South Avenue\, Poughkeepsie\, New York\, United States\
 , 12601
ORGANIZER:barteta@cenhud.com
SEQUENCE:9
SUMMARY:Utility-Scale Transformer Workshop
URL;VALUE=URI:https://events.vtools.ieee.org/m/41467
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;Utility-scale transformers are custom desi
 gned-built for specific transmission and distribution system requirements.
  There are many different design approaches\, materials and manufacturing 
 processes that can be used to produce utility-scale transformers. These di
 fferences can result in varying levels of system performance\, power trans
 fer efficiency\, fault tolerance\, equipment life\, cost and the like.&amp;nbs
 p\; This two-day workshop will provide instruction on the many options ava
 ilable for the design and manufacture of utility-scale transformers. It wi
 ll cover TAPS\, Quality Assurance inspection (Pre-tanking and FAT Test) an
 d receiving\, assembling\, install and test of transformer at site. It wil
 l also provide insight into specifying the design and manufacture of trans
 formers that are most appropriate for specific system requirements.&lt;/p&gt;\n&lt;
 p&gt;&lt;span style=&quot;text-decoration: underline\;&quot;&gt;&lt;strong&gt;&lt;span style=&quot;font-siz
 e: 12pt\;&quot;&gt;The workshop fee includes breakfast\, morning refreshments and 
 lunch.&lt;/span&gt;&lt;/strong&gt;&lt;/span&gt;&lt;/p&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /&gt;&lt;p&gt;Day 1: Novem
 ber 16\, 2016&lt;/p&gt;\n&lt;p&gt;P1: Electrical &amp;amp\; Mechanical Design&lt;/p&gt;\n&lt;p&gt;P2: 
 Taps&lt;/p&gt;\n&lt;p&gt;P3: Transformer Manufacturing Process&lt;/p&gt;\n&lt;p&gt;Day 2: November
  17\, 2016&lt;/p&gt;\n&lt;p&gt;P4: Pre-tanking Inspection&lt;/p&gt;\n&lt;p&gt;P5: Factory Acceptan
 ce Test Inspection&lt;/p&gt;\n&lt;p&gt;P6: Recieving\, Assembling\, Install &amp;amp\; Tes
 t&lt;/p&gt;\n&lt;p&gt;P7: Transformer Specification Preparation&lt;/p&gt;