BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:Europe/Stockholm
BEGIN:DAYLIGHT
DTSTART:20260329T030000
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
RRULE:FREQ=YEARLY;BYDAY=-1SU;BYMONTH=3
TZNAME:CEST
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20251026T020000
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
RRULE:FREQ=YEARLY;BYDAY=-1SU;BYMONTH=10
TZNAME:CET
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20260218T104614Z
UID:3C2231DE-6758-4A49-944C-7918039134AB
DTSTART;TZID=Europe/Stockholm:20260327T150000
DTEND;TZID=Europe/Stockholm:20260327T170000
DESCRIPTION:Pls join us for the Annual Meeting of the joint Swedish Chapter
  of Power &amp; Energy Society and Power Electronics Society on March 27\, 202
 6!\nApart from news from the Chapter and reports from the board\, we will 
 listen to an interesting technical seminar\, and award the prize for the b
 est MSc thesis\, Outstanding Engineer Award and Outstanding Volunteer Awar
 d.\n\nAgenda:\n\n- Activity Report 2025\n- Keynote Speech by new IEEE Fell
 ow\, Abhay Kumar\, Senior Principal Project Lead Engineer at Global HVDC E
 ngineering\, Hitachi Energy\n- Awards announcement:\n– Best M.Sc. thesis
  2025\n– Outstanding Engineer Award 2025\n– Outstanding Volunteer Awar
 d 2025\n\nKeynote Speech: “Status and Trends of HVDC in India”\n\nAbst
 ract:\n\nGovernment of India has set an ambitious target of 500 GW of Non 
 fossil electric generation capacity by 2030 and adhering Net Zero emission
  by 2070. For achieving the ambitious target\, there has been constant add
 ition of Renewable Energy in the Indian grid over the past several years. 
 Most of the Renewable Energy (RE) Sources such as solar and wind are locat
 ion dependent in their production and thus need long distance transmission
  to serve the load. The major inverter bases resource (IBR) generation is 
 envisaged in Rajasthan in North\, Gujrat in West and Karnataka in South wh
 ile major load centres are located in Punjab and Delhi in North\, Maharash
 tra in West and Telengana in South part of the country primarily requiring
  transfer of bulk power for long distances. As per the 2024 National Elect
 ricity Plan (NEP)\, the installed HVDC transmission system as on date is 3
 4500 MW having up to +/- 800 kV Bipole and several back-to-back system in 
 operation and addition of another 32250 MW of HVDC Bipole system comprises
  of LCC and VSC based HVDC system is envisaged in the Transmission system 
 Planning with the total installed HVDC Transmission capacity of 66750 MW b
 y 2032. The NEP envisages the transmission of bulk power from Renewable En
 ergy Parks through long distance high capacity HVDC Transmission system fo
 r power evacuation\, mostly with overhead (OH) line.\n\nBio of Keynote spe
 aker:\n\nAbhay Kumar (Jain) is Senior Principal Project Lead Engineer at G
 lobal HVDC Engineering with Hitachi Energy in Ludvika\, Sweden. He studied
  Electrical Engineering at the Indian Institute of Technology (IIT)\, Roor
 kee in India and started his professional career in 1982. Recently he has 
 been playing a key role in executing several 800 kV UHVDC Projects. He is 
 Swedish member of CIGRE SC B4 and has been active in several IEEE\, IEC an
 d CIGRE working groups. He is recipient IEEE PES Uno Lamm HVDC Award (2019
 )\, IEC 1906 Award (2020) and CIGRE Honorary Member Award (2022). He is Fe
 llow of IEEE.\n\nRoom: 3412\, Teknikringen 33\,  floor 4\, room Sten Velan
 der \, Stockholm\, Stockholms lan\, Sweden\, 11543\, Virtual: https://eve
 nts.vtools.ieee.org/m/538334
LOCATION:Room: 3412\, Teknikringen 33\,  floor 4\, room Sten Velander \, S
 tockholm\, Stockholms lan\, Sweden\, 11543\, Virtual: https://events.vtool
 s.ieee.org/m/538334
ORGANIZER:qianwenx@kth.se
SEQUENCE:27
SUMMARY:Annual meeting\, IEEE Sweden PES/PELS Chapter
URL;VALUE=URI:https://events.vtools.ieee.org/m/538334
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;Pls join us for the Annual Meeting of the 
 joint Swedish Chapter of Power &amp;amp\; Energy Society and Power Electronics
  Society on March 27\, 2026!&amp;nbsp\;&lt;br&gt;Apart from news from the Chapter an
 d reports from the board\, we will listen to an interesting technical semi
 nar\,&amp;nbsp\; and award the prize for the best MSc thesis\, Outstanding Eng
 ineer Award and Outstanding Volunteer Award.&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;&lt;strong&gt;&lt;u&gt;Age
 nda&lt;/u&gt;&lt;/strong&gt;&lt;strong&gt;:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul&gt;\n&lt;li&gt;Activity Report 2025&lt;/li
 &gt;\n&lt;li&gt;Keynote Speech by new IEEE Fellow\, Abhay Kumar\, Senior Principal 
 Project Lead Engineer at Global HVDC Engineering\, Hitachi Energy&lt;/li&gt;\n&lt;l
 i&gt;Awards announcement:&amp;nbsp\;&lt;br&gt;&amp;ndash\; Best M.Sc. thesis 2025&lt;br&gt;&amp;ndash
 \; Outstanding Engineer Award 2025&lt;br&gt;&amp;ndash\; Outstanding Volunteer Award
  2025&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p&gt;&amp;nbsp\;&lt;/p&gt;\n&lt;p&gt;Keynote Speech:&amp;nbsp\; &amp;ldquo\;Statu
 s and Trends of HVDC in India&amp;rdquo\;&lt;/p&gt;\n&lt;p&gt;Abstract:&lt;/p&gt;\n&lt;p&gt;Government
  of India has set an ambitious target of 500 GW of Non fossil electric gen
 eration capacity by 2030 and adhering Net Zero emission by 2070. For achie
 ving the ambitious target\, there has been constant addition of Renewable 
 Energy in the Indian grid over the past several years. Most of the Renewab
 le Energy (RE) Sources such as solar and wind are location dependent in th
 eir production and thus need long distance transmission to serve the load.
  The major inverter bases resource (IBR) generation is envisaged in Rajast
 han in North\, Gujrat in West and Karnataka in South while major load cent
 res are located in Punjab and Delhi in North\, Maharashtra in West and Tel
 engana in South part of the country primarily requiring transfer of bulk p
 ower for long distances. As per the 2024 National Electricity Plan (NEP)\,
  the installed HVDC transmission system as on date is 34500 MW having up t
 o +/- 800 kV Bipole and several back-to-back system in operation and addit
 ion of another 32250 MW of HVDC Bipole system comprises of LCC and VSC bas
 ed HVDC system is envisaged in the Transmission system Planning with the t
 otal installed HVDC Transmission capacity of 66750 MW by 2032. The NEP env
 isages the transmission of bulk power from Renewable Energy Parks through 
 long distance high capacity HVDC Transmission system for power evacuation\
 , mostly with overhead (OH) line.&lt;/p&gt;\n&lt;p&gt;Bio of Keynote speaker:&lt;/p&gt;\n&lt;p&gt;
 Abhay Kumar (Jain) is Senior Principal Project Lead Engineer at Global HVD
 C Engineering with Hitachi Energy in Ludvika\, Sweden. He studied Electric
 al Engineering at the Indian Institute of Technology (IIT)\, Roorkee in In
 dia and started his professional career in 1982. Recently he has been play
 ing a key role in executing several 800 kV UHVDC Projects. He is Swedish m
 ember of CIGRE SC B4 and has been active in several IEEE\, IEC and CIGRE w
 orking groups. He is recipient IEEE PES Uno Lamm HVDC Award (2019)\, IEC 1
 906 Award (2020) and CIGRE Honorary Member Award (2022). He is Fellow of I
 EEE.&amp;nbsp\;&lt;/p&gt;
END:VEVENT
END:VCALENDAR

