BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:Asia/Kolkata
BEGIN:STANDARD
DTSTART:19451014T230000
TZOFFSETFROM:+0630
TZOFFSETTO:+0530
TZNAME:IST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20260418T082735Z
UID:66D22F83-0F88-4ED6-B52C-000477CCD116
DTSTART;TZID=Asia/Kolkata:20260518T090000
DTEND;TZID=Asia/Kolkata:20260530T160000
DESCRIPTION:It is designed to provide hands-on\, industry-relevant skills f
 or undergraduate engineering and technology students.\n\nPhase 1: IoT &amp; Ad
 vanced Robotics (Days 1–6)\n\nPhase 2: Drone Technology (Days 7–9)\n\n
 Phase 3: 3D Design &amp; Manufacturing (Days 10–12)\n\nRegistration Fee:\n\n
 IEEE - Rs 2500/-\, Stay and Food - Rs 6500/-\n\nNon- IEEE - Rs 3500/-\, St
 ay and Food - Rs 7500/-\n\nAgenda: \n📅 Internship Agenda (18 May – 30
  May 2026)\n\n🔹 Week 1: IoT &amp; Advanced Robotics (Days 1–6)\n\nDay 1:\
 n\n- Inauguration &amp; Programme Overview\n- Basics of Electronics &amp; Circuit 
 Design\n\nDay 2:\n\n- PCB Design &amp; Fabrication Workshop\n\nDay 3:\n\n- ESP
 32-CAM Spy Bot Development (Live Streaming)\n\nDay 4:\n\n- Smart Home Auto
 mation using IoT\n\nDay 5:\n\n- Cloud Weather Station with Data Logging\n\
 nDay 6:\n\n- Wireless Combat &amp; Racing Robots + Mini Competition\n---------
 ------------------------------------------------------\n\n🔹 Week 2 (Par
 t 1): Drone Technology (Days 7–9)\n\nDay 7:\n\n- Drone Physics &amp; Aerodyn
 amics\n- Components Overview\n\nDay 8:\n\n- Drone Assembly &amp; Calibration (
 Frame\, Motors\, ESCs)\n\nDay 9:\n\n- Flight Controller Configuration (Pix
 hawk/APM)\n- Flight Simulation &amp; Testing\n--------------------------------
 -------------------------------\n\n🔹 Week 2 (Part 2): 3D Design &amp; Manuf
 acturing (Days 10–12)\n\nDay 10:\n\n- Introduction to CAD (Fusion 360)\n
 - Basic 3D Modeling\n\nDay 11:\n\n- 3D Printing Technologies (FDM/SLA)\n- 
 Slicer Software (Cura\, PrusaSlicer)\n\nDay 12:\n\n- Print Optimization\n-
  Post-Processing &amp; Finishing\n- Final Project Demonstration\n-------------
 --------------------------------------------------\n\n🎓 Valedictory (Fi
 nal Day)\n\n- Project Presentation\n- Certificate Distribution\n- Feedback
  &amp; Closing Ceremony\n\nVimal Jyothi Engineering Collegee\, Department of M
 echanical Engineering\, Kannur\, Kerala\, India\, 670632
LOCATION:Vimal Jyothi Engineering Collegee\, Department of Mechanical Engin
 eering\, Kannur\, Kerala\, India\, 670632
ORGANIZER:alanantony@ieee.org
SEQUENCE:34
SUMMARY:Second IEEE SB VJEC Two-Week Internship Training Programme on IoT R
 obotics\, Drone Technology\, 3D Printing and Industrial Robot
URL;VALUE=URI:https://events.vtools.ieee.org/m/555829
X-ALT-DESC:Description: &lt;br /&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;mso-margin-top-al
 t: auto\; mso-margin-bottom-alt: auto\; line-height: normal\;&quot;&gt;&lt;span style
 =&quot;font-size: 12.0pt\; font-family: &#39;Times New Roman&#39;\,serif\; mso-fareast-
 font-family: &#39;Times New Roman&#39;\;&quot;&gt;It is designed to provide hands-on\, ind
 ustry-relevant skills for undergraduate engineering and technology student
 s.&lt;/span&gt;&lt;/p&gt;\n&lt;p class=&quot;MsoNormal&quot; style=&quot;mso-margin-top-alt: auto\; mso-
 margin-bottom-alt: auto\; line-height: normal\; mso-outline-level: 3\;&quot;&gt;&lt;s
 trong&gt;&lt;span style=&quot;font-size: 13.5pt\; font-family: &#39;Times New Roman&#39;\,ser
 if\; mso-fareast-font-family: &#39;Times New Roman&#39;\;&quot;&gt;Phase 1: IoT &amp;amp\; Adv
 anced Robotics (Days 1&amp;ndash\;6)&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;\n&lt;p class=&quot;MsoNormal&quot;
  style=&quot;mso-margin-top-alt: auto\; margin-bottom: .0001pt\; line-height: n
 ormal\;&quot;&gt;&lt;span style=&quot;font-size: 12.0pt\; font-family: &#39;Times New Roman&#39;\,
 serif\; mso-fareast-font-family: &#39;Times New Roman&#39;\;&quot;&gt;&amp;nbsp\;&lt;/span&gt;&lt;stron
 g&gt;&lt;span style=&quot;font-size: 13.5pt\; font-family: &#39;Times New Roman&#39;\,serif\;
  mso-fareast-font-family: &#39;Times New Roman&#39;\;&quot;&gt;Phase 2: Drone Technology (
 Days 7&amp;ndash\;9)&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;\n&lt;p class=&quot;MsoNormal&quot; style=&quot;mso-marg
 in-top-alt: auto\; mso-margin-bottom-alt: auto\; line-height: normal\; mso
 -outline-level: 3\;&quot;&gt;&lt;strong&gt;&lt;span style=&quot;font-size: 13.5pt\; font-family:
  &#39;Times New Roman&#39;\,serif\; mso-fareast-font-family: &#39;Times New Roman&#39;\;&quot;&gt;
 Phase 3: 3D Design &amp;amp\; Manufacturing (Days 10&amp;ndash\;12)&lt;/span&gt;&lt;/strong
 &gt;&lt;/p&gt;\n&lt;p&gt;Registration Fee:&lt;/p&gt;\n&lt;p&gt;IEEE - Rs 2500/-\, Stay and Food - Rs 
 6500/-&lt;/p&gt;\n&lt;p&gt;Non- IEEE - Rs 3500/-\, Stay and Food - Rs 7500/-&lt;/p&gt;&lt;br /&gt;
 &lt;br /&gt;Agenda: &lt;br /&gt;&lt;h2 data-section-id=&quot;1s23m4t&quot; data-start=&quot;86&quot; data-end
 =&quot;136&quot;&gt;&lt;span role=&quot;text&quot;&gt;📅 &lt;strong data-start=&quot;92&quot; data-end=&quot;136&quot;&gt;Inter
 nship Agenda (18 May &amp;ndash\; 30 May 2026)&lt;/strong&gt;&lt;/span&gt;&lt;/h2&gt;\n&lt;h3 data-
 section-id=&quot;14cctq0&quot; data-start=&quot;138&quot; data-end=&quot;191&quot;&gt;&lt;span role=&quot;text&quot;&gt;
 🔹 &lt;strong data-start=&quot;145&quot; data-end=&quot;191&quot;&gt;Week 1: IoT &amp;amp\; Advanced R
 obotics (Days 1&amp;ndash\;6)&lt;/strong&gt;&lt;/span&gt;&lt;/h3&gt;\n&lt;p data-start=&quot;192&quot; data-e
 nd=&quot;204&quot;&gt;&lt;strong data-start=&quot;192&quot; data-end=&quot;202&quot;&gt;Day 1:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul 
 data-start=&quot;205&quot; data-end=&quot;285&quot;&gt;\n&lt;li data-section-id=&quot;1316yyn&quot; data-start
 =&quot;205&quot; data-end=&quot;242&quot;&gt;Inauguration &amp;amp\; Programme Overview&lt;/li&gt;\n&lt;li dat
 a-section-id=&quot;lbfin2&quot; data-start=&quot;243&quot; data-end=&quot;285&quot;&gt;Basics of Electronic
 s &amp;amp\; Circuit Design&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p data-start=&quot;287&quot; data-end=&quot;299&quot;&gt;&lt;s
 trong data-start=&quot;287&quot; data-end=&quot;297&quot;&gt;Day 2:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul data-start=
 &quot;300&quot; data-end=&quot;337&quot;&gt;\n&lt;li data-section-id=&quot;d9vgiw&quot; data-start=&quot;300&quot; data-
 end=&quot;337&quot;&gt;PCB Design &amp;amp\; Fabrication Workshop&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p data-star
 t=&quot;339&quot; data-end=&quot;351&quot;&gt;&lt;strong data-start=&quot;339&quot; data-end=&quot;349&quot;&gt;Day 3:&lt;/str
 ong&gt;&lt;/p&gt;\n&lt;ul data-start=&quot;352&quot; data-end=&quot;402&quot;&gt;\n&lt;li data-section-id=&quot;1x1sm
 52&quot; data-start=&quot;352&quot; data-end=&quot;402&quot;&gt;ESP32-CAM Spy Bot Development (Live St
 reaming)&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p data-start=&quot;404&quot; data-end=&quot;416&quot;&gt;&lt;strong data-star
 t=&quot;404&quot; data-end=&quot;414&quot;&gt;Day 4:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul data-start=&quot;417&quot; data-end=
 &quot;452&quot;&gt;\n&lt;li data-section-id=&quot;ysw5kl&quot; data-start=&quot;417&quot; data-end=&quot;452&quot;&gt;Smart
  Home Automation using IoT&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p data-start=&quot;454&quot; data-end=&quot;466&quot;
 &gt;&lt;strong data-start=&quot;454&quot; data-end=&quot;464&quot;&gt;Day 5:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul data-sta
 rt=&quot;467&quot; data-end=&quot;510&quot;&gt;\n&lt;li data-section-id=&quot;19wzqmi&quot; data-start=&quot;467&quot; d
 ata-end=&quot;510&quot;&gt;Cloud Weather Station with Data Logging&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p data
 -start=&quot;512&quot; data-end=&quot;524&quot;&gt;&lt;strong data-start=&quot;512&quot; data-end=&quot;522&quot;&gt;Day 6:
 &lt;/strong&gt;&lt;/p&gt;\n&lt;ul data-start=&quot;525&quot; data-end=&quot;579&quot;&gt;\n&lt;li data-section-id=&quot;
 192umgy&quot; data-start=&quot;525&quot; data-end=&quot;579&quot;&gt;Wireless Combat &amp;amp\; Racing Rob
 ots + Mini Competition&lt;/li&gt;\n&lt;/ul&gt;\n&lt;hr data-start=&quot;581&quot; data-end=&quot;584&quot;&gt;\n
 &lt;h3 data-section-id=&quot;r4boc6&quot; data-start=&quot;586&quot; data-end=&quot;643&quot;&gt;&lt;span role=&quot;t
 ext&quot;&gt;🔹 &lt;strong data-start=&quot;593&quot; data-end=&quot;641&quot;&gt;Week 2 (Part 1): Drone T
 echnology (Days 7&amp;ndash\;9)&lt;/strong&gt;&lt;/span&gt;&lt;/h3&gt;\n&lt;p data-start=&quot;644&quot; data
 -end=&quot;656&quot;&gt;&lt;strong data-start=&quot;644&quot; data-end=&quot;654&quot;&gt;Day 7:&lt;/strong&gt;&lt;/p&gt;\n&lt;u
 l data-start=&quot;657&quot; data-end=&quot;713&quot;&gt;\n&lt;li data-section-id=&quot;vrepoo&quot; data-star
 t=&quot;657&quot; data-end=&quot;689&quot;&gt;Drone Physics &amp;amp\; Aerodynamics&lt;/li&gt;\n&lt;li data-se
 ction-id=&quot;y1te2f&quot; data-start=&quot;690&quot; data-end=&quot;713&quot;&gt;Components Overview&lt;/li&gt;
 \n&lt;/ul&gt;\n&lt;p data-start=&quot;715&quot; data-end=&quot;727&quot;&gt;&lt;strong data-start=&quot;715&quot; data-
 end=&quot;725&quot;&gt;Day 8:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul data-start=&quot;728&quot; data-end=&quot;782&quot;&gt;\n&lt;li d
 ata-section-id=&quot;1mt9ky2&quot; data-start=&quot;728&quot; data-end=&quot;782&quot;&gt;Drone Assembly &amp;a
 mp\; Calibration (Frame\, Motors\, ESCs)&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p data-start=&quot;784&quot; 
 data-end=&quot;796&quot;&gt;&lt;strong data-start=&quot;784&quot; data-end=&quot;794&quot;&gt;Day 9:&lt;/strong&gt;&lt;/p&gt;
 \n&lt;ul data-start=&quot;797&quot; data-end=&quot;878&quot;&gt;\n&lt;li data-section-id=&quot;1buxkl6&quot; data
 -start=&quot;797&quot; data-end=&quot;846&quot;&gt;Flight Controller Configuration (Pixhawk/APM)&lt;
 /li&gt;\n&lt;li data-section-id=&quot;1gwytcj&quot; data-start=&quot;847&quot; data-end=&quot;878&quot;&gt;Flight
  Simulation &amp;amp\; Testing&lt;/li&gt;\n&lt;/ul&gt;\n&lt;hr data-start=&quot;880&quot; data-end=&quot;883
 &quot;&gt;\n&lt;h3 data-section-id=&quot;otru5q&quot; data-start=&quot;885&quot; data-end=&quot;953&quot;&gt;&lt;span rol
 e=&quot;text&quot;&gt;🔹 &lt;strong data-start=&quot;892&quot; data-end=&quot;951&quot;&gt;Week 2 (Part 2): 3D 
 Design &amp;amp\; Manufacturing (Days 10&amp;ndash\;12)&lt;/strong&gt;&lt;/span&gt;&lt;/h3&gt;\n&lt;p d
 ata-start=&quot;954&quot; data-end=&quot;967&quot;&gt;&lt;strong data-start=&quot;954&quot; data-end=&quot;965&quot;&gt;Day
  10:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul data-start=&quot;968&quot; data-end=&quot;1026&quot;&gt;\n&lt;li data-section
 -id=&quot;1gv2j8p&quot; data-start=&quot;968&quot; data-end=&quot;1004&quot;&gt;Introduction to CAD (Fusion
  360)&lt;/li&gt;\n&lt;li data-section-id=&quot;1b3mwcq&quot; data-start=&quot;1005&quot; data-end=&quot;1026
 &quot;&gt;Basic 3D Modeling&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p data-start=&quot;1028&quot; data-end=&quot;1041&quot;&gt;&lt;str
 ong data-start=&quot;1028&quot; data-end=&quot;1039&quot;&gt;Day 11:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul data-start
 =&quot;1042&quot; data-end=&quot;1120&quot;&gt;\n&lt;li data-section-id=&quot;wharg1&quot; data-start=&quot;1042&quot; d
 ata-end=&quot;1080&quot;&gt;3D Printing Technologies (FDM/SLA)&lt;/li&gt;\n&lt;li data-section-i
 d=&quot;1o3rk96&quot; data-start=&quot;1081&quot; data-end=&quot;1120&quot;&gt;Slicer Software (Cura\, Prus
 aSlicer)&lt;/li&gt;\n&lt;/ul&gt;\n&lt;p data-start=&quot;1122&quot; data-end=&quot;1135&quot;&gt;&lt;strong data-st
 art=&quot;1122&quot; data-end=&quot;1133&quot;&gt;Day 12:&lt;/strong&gt;&lt;/p&gt;\n&lt;ul data-start=&quot;1136&quot; dat
 a-end=&quot;1222&quot;&gt;\n&lt;li data-section-id=&quot;o76t14&quot; data-start=&quot;1136&quot; data-end=&quot;11
 58&quot;&gt;Print Optimization&lt;/li&gt;\n&lt;li data-section-id=&quot;17i9mn7&quot; data-start=&quot;115
 9&quot; data-end=&quot;1190&quot;&gt;Post-Processing &amp;amp\; Finishing&lt;/li&gt;\n&lt;li data-section
 -id=&quot;141mg0k&quot; data-start=&quot;1191&quot; data-end=&quot;1222&quot;&gt;Final Project Demonstratio
 n&lt;/li&gt;\n&lt;/ul&gt;\n&lt;hr data-start=&quot;1224&quot; data-end=&quot;1227&quot;&gt;\n&lt;h3 data-section-id
 =&quot;pry6oo&quot; data-start=&quot;1229&quot; data-end=&quot;1263&quot;&gt;&lt;span role=&quot;text&quot;&gt;🎓 &lt;strong
  data-start=&quot;1236&quot; data-end=&quot;1263&quot;&gt;Valedictory (Final Day)&lt;/strong&gt;&lt;/span&gt;
 &lt;/h3&gt;\n&lt;ul data-start=&quot;1264&quot; data-end=&quot;1349&quot;&gt;\n&lt;li data-section-id=&quot;1lccje
 z&quot; data-start=&quot;1264&quot; data-end=&quot;1288&quot;&gt;Project Presentation&lt;/li&gt;\n&lt;li data-s
 ection-id=&quot;1w36b9j&quot; data-start=&quot;1289&quot; data-end=&quot;1317&quot;&gt;Certificate Distribu
 tion&lt;/li&gt;\n&lt;li data-section-id=&quot;mnjcy8&quot; data-start=&quot;1318&quot; data-end=&quot;1349&quot;&gt;
 Feedback &amp;amp\; Closing Ceremony&lt;/li&gt;\n&lt;/ul&gt;
END:VEVENT
END:VCALENDAR

