BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:Asia/Singapore
BEGIN:DAYLIGHT
DTSTART:20380119T111407
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
RRULE:FREQ=YEARLY;BYDAY=3TU;BYMONTH=1
TZNAME:+08
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:19820101T000000
TZOFFSETFROM:+0730
TZOFFSETTO:+0800
RRULE:FREQ=YEARLY;BYDAY=1FR;BYMONTH=1
TZNAME:+08
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20260621T002535Z
UID:E0717841-00E3-4155-BC9D-3AD54501297B
DTSTART;TZID=Asia/Singapore:20260620T090000
DTEND;TZID=Asia/Singapore:20260620T120000
DESCRIPTION:RTSO PRESENTATION ON OSIT @ SRTC BY RTSO\n\nOrganiser : MSI Glo
 bal Pte Ltd (SRTC Operator)\nParticipants : NTU IEEE Life Member Affinity 
 Group (Est. 30 – 40pax)\nEvent : RTS Link OSIT At SRTC\nDate : Sat\, 20 
 June 2026 (AM)\nDuration : 1 hour (45 mins presentation\; 15 mins Q&amp;A)\n\n
 - BACKGROUND\nThis event is an opportunity to showcase the successful comp
 letion of the RTS Link Offsite Integrated Testing (OSIT) conducted at SRTC
 . The structure of this talk to emphasize the strategic foresight of testi
 ng the RTS Link system at SRTC before moving to the mainline.\n- SPEAKERS 
 &amp; PRESENTATION SCOPE\nTo ensure both strategic oversight and technical dep
 th\, the session will cover the following scope and led by the following R
 TSO speakers:\ni. Mr Zahrin Abdul Gani\, Project Director: The &quot;Why&quot; Behin
 d OSIT\n• Introduction to RTS Operations\n• Strategic vision for the R
 TS Link project and the critical role of integrated testing in cross-borde
 r infrastructure success.\n• Proactive strategy of resolving system comp
 lexities and technical interfaces with collaboration and synergy between R
 TSO\, System Consultant and Work Package Contractors in a controlled envir
 onment.\n• Risk-mitigation approach towards the transition to onsite com
 missioning.\nii. Ms Azizah Sapari\, OSIT Project Lead: The OSIT Road Map\n
 • Project Rollout: Strategic planning and resource mobilization at the S
 RTC facility.\n• Testing Methodology: A technical deep-dive into how tes
 ting was conducted\, specifically the integration between rolling stock an
 d signaling systems.\n\nSpeaker(s): Zahrin\, Azizah\n\nAgenda: \n\n\nTaxi 
 Stand of Chinese Garden MRT Station\, 151 Boon Lay Way\, Jurong East\, Sin
 gapore\, Singapore\, 609959
LOCATION:Taxi Stand of Chinese Garden MRT Station\, 151 Boon Lay Way\, Juro
 ng East\, Singapore\, Singapore\, 609959
ORGANIZER:ehbgooi@ntu.edu.sg
SEQUENCE:100
SUMMARY:IEEE Site Visit to SRTC cum Seminar\, &quot;RTS Link&#39;s Offsite Integrate
 d Testing (OSIT) @ Singapore Rail Test Center (SRTC)&quot; by RTS Operations Pt
 e Ltd (RTSO)
URL;VALUE=URI:https://events.vtools.ieee.org/m/560742
X-ALT-DESC:Description: &lt;br /&gt;&lt;p&gt;RTSO PRESENTATION ON OSIT @ SRTC BY RTSO&lt;b
 r&gt;&lt;br&gt;Organiser : MSI Global Pte Ltd (SRTC Operator)&lt;br&gt;Participants : NTU
  IEEE Life Member Affinity Group (Est. 30 &amp;ndash\; 40pax)&lt;br&gt;Event : RTS L
 ink OSIT At SRTC&lt;br&gt;Date : Sat\, 20 June 2026 (AM)&lt;br&gt;Duration : 1 hour (4
 5 mins presentation\; 15 mins Q&amp;amp\;A)&lt;/p&gt;\n&lt;ol&gt;\n&lt;li&gt;BACKGROUND&lt;br&gt;This 
 event is an opportunity to showcase the successful completion of the RTS&amp;n
 bsp\;Link Offsite Integrated Testing (OSIT) conducted at SRTC. The structu
 re of this talk to emphasize the strategic foresight of testing the RTS Li
 nk system at SRTC before moving to the mainline.&lt;/li&gt;\n&lt;li&gt;SPEAKERS &amp;amp\;
  PRESENTATION SCOPE&lt;br&gt;To ensure both strategic oversight and technical de
 pth\, the session will cover the&amp;nbsp\;following scope and led by the foll
 owing RTSO speakers:&lt;br&gt;i. &lt;strong&gt;Mr Zahrin Abdul Gani&lt;/strong&gt;\, Project
  Director: The &quot;Why&quot; Behind OSIT&lt;br&gt;&amp;nbsp\; &amp;bull\; Introduction to RTS Op
 erations&lt;br&gt;&amp;nbsp\; &amp;bull\; Strategic vision for the RTS Link project and 
 the critical role of integrated testing in cross-border infrastructure suc
 cess.&lt;br&gt;&amp;nbsp\; &amp;bull\; Proactive strategy of resolving system complexiti
 es and technical interfaces with collaboration and synergy between RTSO\, 
 System Consultant and Work Package Contractors in a controlled environment
 .&lt;br&gt;&amp;nbsp\; &amp;bull\;&amp;nbsp\; Risk-mitigation approach towards the transitio
 n to onsite commissioning.&lt;br&gt;ii. &lt;strong&gt;Ms Azizah Sapari&lt;/strong&gt;\, OSIT
  Project Lead: The OSIT Road Map&lt;br&gt;&amp;nbsp\; &amp;bull\;&amp;nbsp\; Project Rollout
 : Strategic planning and resource mobilization at the SRTC facility.&lt;br&gt;&amp;n
 bsp\; &amp;bull\;&amp;nbsp\; Testing Methodology: A technical deep-dive into how t
 esting was conducted\, specifically the integration between rolling stock 
 and&amp;nbsp\; &amp;nbsp\;&amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\; &amp;nbsp\;signaling
  systems.&lt;/li&gt;\n&lt;/ol&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /&gt;&lt;p&gt;&lt;img src=&quot;https://events
 .vtools.ieee.org/vtools_ui/media/display/b55c356a-a980-47a8-9323-db88f4621
 635&quot; width=&quot;468&quot; height=&quot;317&quot;&gt;&lt;/p&gt;
END:VEVENT
END:VCALENDAR

