BEGIN:VCALENDAR
VERSION:2.0
PRODID:IEEE vTools.Events//EN
CALSCALE:GREGORIAN
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
DTSTART:20260308T030000
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZNAME:EDT
END:DAYLIGHT
BEGIN:STANDARD
DTSTART:20261101T010000
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZNAME:EST
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20260731T141453Z
UID:DBBEED1E-C2AC-4960-A1ED-E4CF6D958CC0
DTSTART;TZID=America/New_York:20260727T123000
DTEND;TZID=America/New_York:20260727T153000
DESCRIPTION:Engineers from Hubbell will present on the following\n\n• The
 ory behind arresters\n• MOVs (manufacturing process)—heavy focus on MO
 Vs.\n• Sizes and how to determine which to use for which projects.\n• 
 Overview of the total design and how they should be correctly utilized and
  installed in the field.\n• Total offerings for Distribution\, Transmiss
 ion and Substation.\n\nPre-registration is required for security purposes.
  Event consists of a social lunch from 12:30-1:30 with the presentation be
 ginning at 1:30 PM. Eligible for 2 hours of PDH and CEUs. Asking for a don
 ation of $5-10 per person towards lunch\, taken day off as cash.\n\nSpeake
 r(s): Dan\, Patrick\, Chase\n\nAgenda: \nLunch\n\nTheory behind arresters\
 nMOVs (manufacturing process)—heavy focus on MOVs.\nSizes and how to det
 ermine which to use for which projects.\nOverview of the total design and 
 how they should be correctly utilized and installed in the field.\nTotal o
 fferings for Distribution\, Transmission and Substation.\n\nCentral Hudson
  Gas &amp; Electric\, 284 South Ave\, Poughkeepsie\, New York\, United States\
 , 12601
LOCATION:Central Hudson Gas &amp; Electric\, 284 South Ave\, Poughkeepsie\, New
  York\, United States\, 12601
ORGANIZER:ascott@cleancapital.com
SEQUENCE:23
SUMMARY:Lightning Arresters presented by Hubbell
URL;VALUE=URI:https://events.vtools.ieee.org/m/567726
X-ALT-DESC:Description: &lt;br /&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;font-size: 
 11.0pt\;&quot;&gt;&lt;span data-teams=&quot;true&quot;&gt;Engineers from Hubbell will present on t
 he following&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;\n&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;font-siz
 e: 11.0pt\;&quot;&gt;&lt;span data-teams=&quot;true&quot;&gt;&amp;bull\; Theory behind arresters&lt;br&gt;&amp;b
 ull\; MOVs (manufacturing process)&amp;mdash\;heavy focus on MOVs.&lt;br&gt;&amp;bull\; 
 Sizes and how to determine which to use for which projects.&lt;br&gt;&amp;bull\; Ove
 rview of the total design and how they should be correctly utilized and in
 stalled in the field.&lt;br&gt;&amp;bull\; Total offerings for Distribution\, Transm
 ission and Substation.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;\n&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style
 =&quot;font-size: 11.0pt\;&quot;&gt;Pre-registration is required for security purposes.
  Event consists of a social lunch from 12:30-1:30 with the presentation be
 ginning at 1:30 PM. Eligible for 2 hours of PDH and CEUs. Asking for a don
 ation of $5-10 per person towards lunch\, taken day off as cash.&amp;nbsp\;&lt;/s
 pan&gt;&lt;/p&gt;&lt;br /&gt;&lt;br /&gt;Agenda: &lt;br /&gt;&lt;p&gt;Lunch&lt;/p&gt;\n&lt;p&gt;&lt;span style=&quot;font-size:
  11.0pt\;&quot;&gt;&lt;span data-teams=&quot;true&quot;&gt;Theory behind arresters&lt;br&gt;MOVs (manufa
 cturing process)&amp;mdash\;heavy focus on MOVs.&lt;br&gt;Sizes and how to determine
  which to use for which projects.&lt;br&gt;Overview of the total design and how 
 they should be correctly utilized and installed in the field.&lt;br&gt;Total off
 erings for Distribution\, Transmission and Substation.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
END:VEVENT
END:VCALENDAR

