The Iberian blackout of April 28, 2025

#portugal #engineering #blackout #Electrical #grid #Energy
Share

Strengths and weaknesses of the Iberian electrical system


This event will present the reasons and problems that led to the electricity blackout on April 28, 2025. Some of the current strengths and weaknesses of the Iberian electrical system will be addressed, and some possible solutions and improvements for the future will be suggested.



  Date and Time

  Location

  Hosts

  Registration



  • Add_To_Calendar_icon Add Event to Calendar
  • Rua Conselheiro Emídio Navarro, 1
  • Lisbon, Lisboa
  • Portugal 1959-007
  • Building: F
  • Room Number: Auditório Chagas Gomes, 1st floor
  • Click here for Map

  • Contact Event Host
  • Co-sponsored by Instituto Superior de Engenharia de Lisboa; REN - Rede Eléctrica Nacional


  Speakers

Eng. Rui Pestana of ISEL - Instituto Superior de Engenharia de Lisboa

Topic:

Engen. Rui Pestana

Biography:

Eng. Rui Pestana, Mestrado em engenharia eletrotécnica e de computadores pelo Instituto Superior Técnico da Universidade de Lisboa, Portugal. É assessor da divisão do Gestor do Sistema da REN - Rede Eléctrica Nacional, S.A. Gestor de projetos no Centro de Investigação em Energia REN - State Grid, S.A. (R&D NESTER). Professor Adjunto convidado no ISEL - Instituto Superior de Engenharia de Lisboa do Instituto Politécnico de Lisboa. Recebeu o título de especialista em Energia pelo Instituto Politécnico de Lisboa. Participou/a em vários GT do CIGRE, ENTSO-E e projetos europeus financiados pelo FP6, FP7 e H2020. Recebeu o “Prêmio do Comitê Técnico da CIGRE”.

Email:

Address:Rua Conselheiro Emídio Navarro, 1, , Lisbon, Lisboa, Portugal, 1959-007