Asset Management for Utility Equipment - PES SA
Asset Replacement Plan Prioritization …based on a monetized risk prediction
Utilities are asset intensive industries with vast amounts of equipment in need of maintenance and replacement. The discussion will be one utility's method of management and some discussion to consider a monetized approach to prioritize asset replacements.
Date and Time
Location
Hosts
Registration
- Date: 23 Jan 2020
- Time: 06:00 PM to 08:00 PM
- All times are (UTC-06:00) Central Time (US & Canada)
- Add Event to Calendar
- Starts 20 December 2019 01:45 PM
- Ends 23 January 2020 08:00 PM
- All times are (UTC-06:00) Central Time (US & Canada)
- No Admission Charge
Speakers
Jose Jarque of CPS Energy
Asset Management for Utility Equipment
A monetized analysis approach to set prioritization of asset replacement at the end of life cycle.
Biography:
Experience in Asset Health/Asset Management for 345/138kV Transmission Circuits and Substations.
Experience in managing Electrical, Mechanical, Civil/Structural and R&D design which include standard and custom designed switchgear for industrial, marine, oil/gas and utility industries. Successful background with internal and outsourced engineering services to sustain a lean, productive and effective engineering department staffing.
Deep involvement on engineering software tools customization, product line standardization and engineering process improvement initiatives.
Product knowledge spans to: Electronic hardware and software (0-48VDC), low voltage (up to 634VAC), medium voltage (1000V to 38 kV) power distribution systems. ANSI/IEEE, UL, NEC, NFPA, CSA standards applied to electromechanical, solid state and microprocessor based equipment, metalclad arc resistant medium and low voltage switchgear, UL508A industrial control panel, circuit breakers (miniature, molded case, air, vacuum and SF6 circuit breakers), including IBC, ASTM standards applied modular, prefabricated welded and/or bolted building structures for outdoor walk in equipment.
Analog-digital-embedded equipment design, prototyping, software and hardware debugging, RTU/PLC onsite technical support assistance, technical document writing.
Passed FE Exam in MAR/2018 for Texas PE Certification. PE Exam pending OCT/2020.
Email: