PAINTING AND REPAIRING OF SEKOLAH KEBANGSAAN IMPIAN EMAS FACILITIES
Due to goverment's announcement of re-opening of school in phases, IEEE UTM PES SBC has worked with SK Impian Emas to repaint some of the school sections of the building and repair piping of their sinks to welcome the returning of students back to their school. Total of 14 volunteer students from IEEE PES UTM SBC and School of Civil Engineering UTM,and 1 supervising lecturer (Dr Jasrul,the club's advisor) participated with this event. The paint job was done at their main walkway and assembly hall while the piping was done at several dispersed location across the school's compound.
Date and Time
Location
Hosts
Registration
-
Add Event to Calendar
Agenda
TUESDAY(02/11/2021)
5.00 pm - gathered at SKE UTM
5.30 pm - left to SK Impian Emas
6.00 pm - arrived at the school and briefing by the caretaker of the school facility
***the team was divided into groups and assigned different tasks such as peeling-scraping, repairing, and painting***
6.30 pm - began painting and repairing work
8.00 pm - dinner and then continue our work
10.30 pm - clean up,photo session and left back to the campus and hostels.
(Update work status/progress to the school's caretaker before leaving)
Media
Briefing by Dr Jasrul | Dr Jasrul opening brief to thank the participants for joining on short notice and explained the activity for the day. | 2.43 MiB |
Dr Jasrul and the school's caretaker | To identify the section of the schools can the participants could help repair | 1.95 MiB |
Painting job by the participants | Painting process done by the participants of the main hall's pillars | 1.66 MiB |
Participants from UTM | Group photos of the participants(from SKA and SKE) at the end of the activity | 2.87 MiB |