Tour of Davis Besse Nuclear Power Station
A tour of Davis-Besse Nuclear Power Station is planned for Thursday, October 20 starting at 5:30 PM.
Davis-Besse Nuclear Power Station, Ohio’s first nuclear power plant, is located 35 miles east of Toledo. The single reactor plant produced its first electricity in 1977. Today, the plant produces 40 percent of the electricity used by residences, businesses and industries in northwestern Ohio.
- Davis-Besse is among Ottawa County’s largest employers with more than 700 full-time employees.
- The Davis-Besse plant contributes more than $6 million annually in local and state taxes.
- In December 2015, the Nuclear Regulatory Commission approved a 20-year license extension for Davis-Besse, and the plant is licensed to operate through 2037.
- More than 733 of the 954 acres that comprise the Davis-Besse site have been designated as protected wetlands called the Navarre Marsh. This marsh is part of a major migratory pathway for birds and is home to several American Bald Eagle nesting sites.
Date and Time
Location
Hosts
Registration
- Date: 20 Oct 2016
- Time: 09:30 PM UTC to 01:30 AM UTC
-
Add Event to Calendar
- Contact Event Host
-
Attendees can contact information to the Power Engineering Chapter Chair, Robert (Bob) Toth (ratoth@firstenergycorp.com). You can call Bob at 419-249-5199 with any questions.
Speakers
Mr. John Greenwood of First Energy
Tour Host - Davis Besse Nuclear Power Station
Biography:
Address:Oak Harbor, United States
Mr. Alan Scheanwald of First Energy
Tour Host - Davis Besse Nuclear Power Station
Biography:
Address:Oak Harbor, United States
Mr. John Greenwood of First Energy
Tour Host - Davis Besse Nuclear Power Station
Biography:
Address:Oak Harbor, United States
Mr. Alan Scheanwald of First Energy
Tour Host - Davis Besse Nuclear Power Station
Biography:
Address:Oak Harbor, United States
Mr. John Greenwood of First Energy
Tour Host - Davis Besse Nuclear Power Station
Biography:
Address:Oak Harbor, United States
Mr. Alan Scheanwald of First Energy
Tour Host - Davis Besse Nuclear Power Station
Biography:
Address:Oak Harbor, United States
Mr. John Greenwood of First Energy
Tour Host - Davis Besse Nuclear Power Station
Biography:
Address:Oak Harbor, United States
Mr. Alan Scheanwald of First Energy
Tour Host - Davis Besse Nuclear Power Station
Biography:
Address:Oak Harbor, United States
Agenda
5:30 PM Light Dinner
6:00 PM Technical Presentation
7:00 PM Tour
9:00 PM Dismissal
All attendee names, social security numbers, and copy of driver’s license must be submitted by October 12 for a background check. Attendees can e-mail this information to the Power Engineering Chapter Chair, Robert (Bob) Toth (ratoth@firstenergycorp.com). You can call Bob at 419-249-5199 with any questions.