Hydroelectric Powerplant Tour

#PowerGeneration #IEEE #IEEESASYP #Electricity #HydroElectricity #IndustryVisit #PowerSystem #Energy #RenewableEnergy #CleanEnergy #ZeroCarbon #EmissionReduction #NetZero #SDGs #PowerGrid #Alberta #Calgary #Engineering
Share

LEARN ABOUT THE HISTORY OF ELECTRICITY IN THE CALGARY AREA IN AN OPERATING MUSEUM. AFTER MORE THAN 100 YEARS OF OPERATION, THE FOUR ORIGINAL GENERATORS ARE STILL PROVIDING POWER TO THE ALBERTA GRID. 


INDUSTRIAL SITE VISIT TO TRANSALTA'S HORSESHOE AND KANANASKIS HYDROELECTRIC FACILITIES.


Dress Code: Long sleeve shirt or coat and closed-toed shoes suitable for walking.
Safety gear: Hard hats, safety glasses and ear plugs will be provided for the tour.
Availability: Number of planned participants is limited to a maximum of 25, on a first come first serve basis.
Note: Inside the facility, touring participants must be able to walk up/downstairs.



  Date and Time

  Location

  Hosts

  Registration



  • Date: 15 Oct 2024
  • Time: 12:00 PM to 06:00 PM
  • All times are (UTC-06:00) Mountain Time (US & Canada)
  • Add_To_Calendar_icon Add Event to Calendar
  • University of Calgary
  • Calgary, Alberta
  • Canada
  • Building: TBD
  • Room Number: TBD
  • Click here for Map

  • Contact Event Host
  • email: hariharan.ram@ieee.org

    Mobile: +1 8252889069

  • Starts 10 September 2024 12:00 AM
  • Ends 11 October 2024 09:00 PM
  • All times are (UTC-06:00) Mountain Time (US & Canada)
  • 0 in-person spaces left!
  • Admission fee ?


  Speakers

Topic:

SAFETY ORIENTATION AND TOUR GUIDE

RON ZIEBER

PRINCIPAL ENGINEER, GENERATORS
P.Eng. (AB & BC)
TRANSALTA CORPORATION





Agenda



NOTE:
1) IT IS MANDATORY TO ATTEND THE SAFETY ORIENTATION BEFORE GETTING STARTED TO THE FACILITY!!!
2) THE REGISTRATION FEE COVERS THE FOOD AND TRAVEL EXPENSES.