ATC Expansion Projects

#transmission, #capacity, #reliability
Share

You will receive an overview of ATC, the Midcontinent Independent System Operators’s (MISO’s) long range transmission project (LRTP) portfolio, and highlights the LRTP Tranche 1 projects in Wisconsin, Western Wisconsin Transmission Connector and Grid Forward Central Wisconsin.

Even if you're in distribution, changes to the Bulk Power System (BPS) have an impact on what you do. Get an insight into the future of power in Wisconsin!



  Date and Time

  Location

  Hosts

  Registration



  • Add_To_Calendar_icon Add Event to Calendar
  • 201 W. Mifflin St
  • Madison, Wisconsin
  • United States 53703
  • Building: Madison Central Library
  • Room Number: 104

  • Contact Event Host
  • Starts 23 September 2025 05:00 AM UTC
  • Ends 22 October 2025 09:00 PM UTC
  • No Admission Charge


  Speakers

Erik of American Transmission Company

Topic:

ATC Expansion Projects

Biography:

Mr. Winsand has been working in Transmission Planning roles for ATC (American Transmission Company) since 2009.

He received Bachelor's degrees in both Electrical Engineering and Business Administration from Michigan Technological University in 2009. 

Address:United States





Agenda

17:45 Pizza arrives

18:00 Housekeeping and introduction of the speaker

18:05 Description of ATC and current expansion projects

18:50 Q&A

19:00 Adjourn



As noted in the agenda, pizza will be served before Mr. Winsand's talk begins. Please register, so that we know how much to get.