Bhopal Dhule Transmission Company Limited (BDTCL), 765/400 KV Substation Sukhi Sewaniya Bhopal

#conductors #transformers #energy #powerelectronics #technology #WIE
Share

BDTCL facilitates the transfer of electricity from coal-fired power generation sources from the states of Odisha and Chhattisgarh to power load centers in India’s western and northern regions. As our largest power transmission project, BDTCL operates six EHV overhead transmission lines of approximately 944 ckms comprising four 765 kV single circuit lines of approximately 891 ckms and two 400 kV dual circuit lines of approximately 53 ckms 

The single circuit lines comprise an approximately 260 ckms line from Jabalpur to Bhopal in Madhya Pradesh, an approximately 176 ckms line from Bhopal to Indore in Madhya Pradesh, an approximately 192 ckms line from Aurangabad to Dhule in Maharashtra and an approximately 263 ckms line from Dhule (Maharashtra) to Vadodara (Gujarat). The double circuit lines consist of an approximately 36 ckms line within Dhule and an approximately 17 ckms line within Bhopal. In addition, the project includes two 3,000 MVA sub-stations, one each in Bhopal and Dhule.

BDTCL was fully commissioned in June 2015. BDTCL was awarded a Silver Shield for the year 2013-2014 in the category of ‘Early Completion of Transmission Projects’ by the Ministry of Power for its Dhule sub-station.

The single circuit lines comprise an approximately 260 ckms line from Jabalpur to Bhopal in Madhya Pradesh, an approximately 176 ckms line from Bhopal to Indore in Madhya Pradesh, an approximately 192 ckms line from Aurangabad to Dhule in Maharashtra and an approximately 263 ckms line from Dhule (Maharashtra) to Vadodara (Gujarat). The double circuit lines consist of an approximately 36 ckms line within Dhule and an approximately 17 ckms line within Bhopal. In addition, the project includes two 3,000 MVA sub-stations, one each in Bhopal and Dhule.

BDTCL was fully commissioned in June 2015. BDTCL was awarded a Silver Shield for the year 2013-2014 in the category of ‘Early Completion of Transmission Projects’ by the Ministry of Power for its Dhule sub-station.



  Date and Time

  Location

  Hosts

  Registration



  • Add_To_Calendar_icon Add Event to Calendar

  • Contact Event Hosts
  • Bhopal - Indore, 765 kV, S/C Line, 4 x Bersimis ACSR or AAAC, 180 Km route

    length

    765/400kV substation at Bhopal with 2 x 1500 MVA

    Bhopal - Bhopal (MPPTCL), 4 x Moose ACSR or AAAC, 40 Kmjavascript:{}

  • Co-sponsored by MPCST Bhopal
  • Survey: Fill out the survey
  • Starts 22 April 2026 06:30 PM UTC
  • Ends 27 April 2026 06:30 PM UTC
  • No Admission Charge






Agenda

Project Description

  • Transmission Line 1:
    Bhopal – Indore, 765 kV Single Circuit (S/C) transmission line using 4 × Bersimis ACSR/AAAC conductors, with an approximate route length of 180 km.
  • Substation Development:
    Establishment of a 765/400 kV substation at Bhopal equipped with 2 × 1500 MVA transformers to ensure efficient power evacuation and grid stability.
  • Transmission Line 2:
    Bhopal – Bhopal (MPPTCL), transmission line using 4 × Moose ACSR/AAAC conductors, with an approximate route length of 40 km.