Data Centers

#data #centers
Share

Payment for the dinner will need to be made by cash or check upon arrival. Online payments are not available at this time.

IEEE Member Price: $30; Non-IEEE Member Price: $35


This presentation will guide you through the process of data center electrical system design. The presentation begins with the preliminary capacity planning process. The process involves assigning the day one and future expanded power needs for the data center, and selection of the appropriate redundant power system topology – N+1, N+2, 2N, 2N+1, or 3N/2. Common redundancy scheme rating systems based on Uptime Institute’s Tier Rating System will be presented, including a discussion of power system, mechanical HVAC, and other ancillary equipment requirements. An overview of equipment configurations will also be presented, including rack layouts, busway design, cable management, and major HVAC equipment needs.



  Date and Time

  Location

  Hosts

  Registration



  • Date: 17 Jan 2019
  • Time: 01:00 AM UTC to 02:00 AM UTC
  • Add_To_Calendar_icon Add Event to Calendar
  • 1828 Abriter Ct
  • Naperville, Illinois
  • United States 60563
  • Building: Granite City Food and Brewery
  • Click here for Map

  • Contact Event Host
  • Starts 04 January 2019 02:00 PM UTC
  • Ends 16 January 2019 09:00 PM UTC
  • No Admission Charge


  Speakers

William Schaumann

Biography:

William C. Schaumann, PE, has over 22 years of experience in the design and construction of industrial, mission critical, and telecommunications facilities. Bill designs electrical systems to achieve energy efficiency, reliability and flexibility, with an emphasis in emergency/redundant power for critical facility environments. Bill earned his Bachelor of Science in Electrical Engineering from the University of Illinois and is a registered Professional Engineer, former Electrical Contractor and Uptime Tier Accredited Designer. He is the Vice President of the 7x24 Exchange Lake Michigan Chapter. Bill received the Charles Steinmetz Award for Technical Merit by the Chicago Electric Association for GM’s enterprise data center in Warren, MI.





Agenda

Social...................................5:30 p.m.

Dinner..................................6:00 p.m.

Presentation..........................7:00 p.m