What does it take to commission a 69kV Transmission Line and Distribution System? Find out today from experts in the field.
The protection system of a four-terminal transmission line involves a high degree of complexity. Many devices, including protection and communication devices, are involved in providing optimal protection to the line in operation. The level of complexity is further increased when, as in the case described in this article, three companies with three different protection philosophies come together to protect such a line. This presentation will describe the commissioning test of the line protection of a four-terminal line. During the test, the responsible protection engineers used a system-based protection test to gain a detailed insight into the behavior of the protection system. Based on article from PAC World, Benjamin Moesslang, March 2023. https://www.pacw.org/commissioning-of-a-220-kv-four-terminal-line-protection-system
Date and Time
Location
Hosts
Registration
- Date: 11 Sep 2023
- Time: 12:00 PM to 01:00 PM
- All times are (UTC-07:00) Pacific Time (US & Canada)
- Add Event to Calendar
- Contact Event Hosts
-
Mike Brisbois
708.668.5488
mike.brisbois@ieee.org - Co-sponsored by IEEE Power and Energy Society
- Starts 01 July 2023 12:00 AM
- Ends 11 September 2023 01:00 PM
- All times are (UTC-07:00) Pacific Time (US & Canada)
- No Admission Charge
Speakers
Aaron Albritton of Motz Engineering
Commissioning High Voltage 69kV Transmission Lines and Distribution System
Commissioning HV transmission lines and 69kV Distribution systems.
Biography:
Email:
Address:Jacksonville , United States
Agenda
12:00 pm PDT IEEE Announcements
12:02 pm PDT Introduction of Speakers
12:04 pm PDT Presentation
12:45 pm Presentation
Protection system for a 69kV Transmission Line. Find out the criteria to accurately commission the line and Distribution System. Flyer Register